ESC09-00616
| General Inspection | 3/1/2010 | 3/1/2010 | 3/1/2010 3:18:38 PM | P | PASS |
|
|
River Bank Stabilzation-Off of ParkCenter Blvd. Rocks are placed, rock breaks in place, willows are planted and partial ground is seeded and bank blankets being installed.
|
ESC09-00812
| General Inspection | 3/1/2010 | 3/1/2010 | 3/1/2010 3:13:09 PM | P | PASS |
|
|
Water quality being discharged appears good, draw down appr. 8 feet to date.
|
ESC10-00131
| General Inspection | 3/1/2010 | 3/1/2010 | 3/1/2010 1:34:49 PM | P | PART |
|
|
This permit is only for a staging area and de-watering basin. Not an acceptable construction entrance, will cause trackout if wet.
|