ESC09-00812
| General Inspection | 3/1/2010 | 3/1/2010 | 3/1/2010 4:42:52 PM | P | CANC |
|
|
Completed by 420
|
ESC09-00770
| General Inspection | 3/1/2010 | 3/1/2010 | 3/1/2010 3:22:41 PM | P | FAIL |
|
|
Verbal correction: (Message to RP:) 1. Clean up all sediment off of hard surfaces. 2. Clean up all concrete wash and provides a washout pit for further clean out. Will re-inspect on 3/2/10 PM.
|
ESC10-00070
| Site Preparation | 3/1/2010 | 3/1/2010 | 3/1/2010 1:56:39 PM | | DONE |
|
|
Completedd by 301
|
ESC10-00076
| Site Preparation | 3/1/2010 | 3/1/2010 | 3/1/2010 1:56:25 PM | | DONE |
|
|
Completed by 301
|
ESC09-00725
| Site Preparation | 3/1/2010 | 3/1/2010 | 3/1/2010 10:58:48 AM | | NR |
|
|
Will re-inspect on 3/5/10am
|
ESC09-00293
| Site Preparation | 3/1/2010 | 3/1/2010 | 3/1/2010 10:47:53 AM | | NR |
|
|
|
ESC10-00133
| Site Preparation | 3/1/2010 | 3/1/2010 | 3/1/2010 10:33:51 AM | | FAIL |
|
|
Message to RP: Must provide a lined washout pit. Will re-inspect on 3/3/10AM
|