| Conference | 3/1/2011 | 3/1/2011 | 3/1/2011 3:02:35 PM | P | DONE |
|
|
Met with operators, including WLG, Brighton and Boise City. Reviewed compliance issues, mainly that turbid discharges from the project into the Boise River is not allowed. Rolled Erosion Control Blanket along Welling Creek need additional staples and wattle moved and re-installed above the top of the blanket to hold back sediment prior to the blanket.
|