PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, March 1, 2011
.
Number of inspections:
16
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC10-00922
BMP Violation
3/1/2011
3/1/2011
3/1/2011 5:34:20 PM
P
FAIL
Message to RP:
CORRECTION NOTICE(VERBAL)
Clean up all concrete washout residual on the vacant lot located on the corner of Orion and Pleasant Hill where it was used as a commen washout for all active lots under construction.
Also install additional a sediment barrer back of sidewalk at the bottom of disturbed slope.
Failure to comply with the notice will result in further enforcement. Will re-inspect on 3/3/2011AM.
ESC11-00001
Complaint Inspection
3/1/2011
3/1/2011
3/1/2011 5:32:46 PM
P
FAIL
Verbal RP:
CORRECTION NOTICE(VERBAL)
Clean up all concrete washout residual on the vacant lot located on the corner of Orion and Pleasant Hill where it was used as a commen washout for all active lots under construction. Failure to comply with the notice will result in further enforcement. Will re-inspect on 3/3/2011AM.
ESC10-00894
Complaint Inspection
3/1/2011
3/1/2011
3/1/2011 5:32:04 PM
P
FAIL
Message to RP:
CORRECTION NOTICE(VERBAL)
Clean up all concrete washout residual on the vacant lot located on the corner of Orion and Pleasant Hill where it was used as a commen washout for all active lots under construction. Failure to comply with the notice will result in further enforcement. Will re-inspect on 3/3/2011AM.
ESC10-00854
BMP Violation
3/1/2011
3/1/2011
3/1/2011 4:58:05 PM
P
FAIL
Verbal to RP:
Clean up all sediment and debris off of all hard surfaces at tghe dfront of the lot. Also re-install and provide sediment barriers along the back of sidewalk due to the lot grade slope being over 2%. Will re-inspect on 2/2/2011PM.
ESC10-00495
General Inspection
3/1/2011
3/1/2011
3/1/2011 4:54:58 PM
FAIL
Verbal to RP:
MAintain all storm drains with the project area. Large amounts of sediment build up tothe side of the storm drains. Will re-inspect on 3/3/2011am.
ESC10-00854
BMP Violation
3/1/2011
3/1/2011
3/1/2011 4:41:58 PM
P
CANC
Duplicate
ESC10-00849
General Inspection
3/1/2011
3/1/2011
3/1/2011 1:21:23 PM
PASS
Work looks complete but will final out once BLD is finalled.
ESC09-00512
Aging Inspection
3/1/2011
3/1/2011
3/1/2011 1:20:32 PM
DONE
Permit Finalled.
ESC09-00512
DOC - Permit Finaled
3/1/2011
3/1/2011
3/1/2011 1:20:25 PM
P
PASS
ESC09-00556
Aging Inspection
3/1/2011
3/1/2011
3/1/2011 10:45:17 AM
DONE
Permit Finalled.
ESC09-00556
DOC - Permit Finaled
3/1/2011
3/1/2011
3/1/2011 10:42:10 AM
P
PASS
ESC09-00556
DOC - Permit Finaled
3/1/2011
3/1/2011
3/1/2011 10:37:57 AM
P
PASS
ESC11-00001
General Inspection
3/1/2011
3/1/2011
3/1/2011 8:57:21 AM
PASS
ESC09-00548
Aging Inspection
3/1/2011
3/1/2011
3/1/2011 8:35:02 AM
DONE
Permit Finalled.
ESC09-00548
DOC - Permit Finaled
3/1/2011
3/1/2011
3/1/2011 8:34:49 AM
P
PASS
ESC10-00869
General Inspection
3/1/2011
3/1/2011
3/1/2011 8:26:27 AM
PASS