Inspections for the day of: Friday, March 1, 2013.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00043 INSP-Sprinkler Rough-in2/28/20133/1/20133/1/2013 4:01:26 PMACANC
Overbooked. Rescheduled for monday. I spoke to Mike with Shilo about this.
FIR12-00750 INSP-Sprinkler Rough-in/Hydro3/1/20133/1/20133/1/2013 3:56:41 PMACANC
Piping was not ready for inspection when I stopped at the project the first time. I could not make it back due to schedule when the piping was ready. Per Sam and I's discussion this will be rescheduled for monday.
FIR12-00662 INSP-Final Inspection2/28/20133/1/20133/1/2013 3:44:26 PMPPASS
Permit finaled.
FIR12-00715 INSP-Final Inspection2/28/20133/1/20133/1/2013 3:43:44 PMPPASS
Permit finaled. THe zone 4 description at central station had to be changed but was done and retested while I waited.
BLD12-00343 FIRE-Final Inspection3/1/20133/1/20133/1/2013 3:21:30 PMPPART
A temporary occupancy was given with scott arellanos permision until the additional smoke alarm is installed in the vestibule between the staff sleeping rooms as per the city approved fire alarm plans. Once installed this device will need to be tested. I also need the final paper work. All other life safety items are ok.
FIR12-00711 INSP-Final Inspection2/27/20133/1/20133/1/2013 3:20:16 PMPPART
A temporary occupancy was given with scott arellanos permision until the additional smoke alarm is installed in the vestibule between the staff sleeping rooms as per the city approved fire alarm plans. Once installed this device will need to be tested. I also need the final paper work.
FIR13-00067 INSP-Final Inspection2/28/20133/1/20133/1/2013 3:17:42 PMPPASS
Permit finaled. Hood suppression system functioned correctly. The manual pull seemed harder to pull than others. I notified the contractor that per IFC 904.11.1 the max force to operate is 40 lbs.
FIR12-00637 INSP-Final Inspection2/28/20133/1/20133/1/2013 3:13:48 PMPPASS
Permit finaled
FIR13-00070 FIR-Aging Inspection3/1/20133/1/20133/1/2013 10:37:48 AMAPART
The underground supply piping from the point of connection to the building foundation is ok to cover.
BLD12-03002 FIRE-Final Inspection2/28/20133/1/20133/1/2013 10:21:15 AMAPART
A temporary occupancy was given with scott arellano's permission. The existing fire alarm system needs to be extended into this new corridor. During my walk through of the existing building I found what appears to be non-compliant audio/visual portion of a fire alarm system. I found some rooms with smoke detectors, some at what appear to be fire doors. I also found strobes overspaced in one room and another with a ceiling mounted horn. I spoke to the superintendant, Ron, about contacting tim woodard in plan review to get the fire dept. involved with this.
FIR12-00662 INSP-Final Inspection2/28/20133/1/20132/28/2013 3:51:57 PMACANC
Please call 45 minutes prior to inspection. Mark is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
FIR12-00637 INSP-Sprinkler Rough-in/Hydro2/28/20133/1/20132/28/2013 9:28:42 AMPCANC
Trent Bice is contact at ###-#### Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
FIR12-00637 INSP-Final Inspection2/28/20133/1/20132/28/2013 9:18:27 AMACANC
Please contact Trent Bice at ###-#### Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt