PLM15-01137
| PLM-Aging Inspection | 3/1/2016 | 3/1/2016 | 3/1/2016 1:57:50 PM | | PEND |
|
|
no calls
|
PLM16-00659
| Sprinkler (Final) | 3/1/2016 | 3/1/2016 | 3/1/2016 1:56:03 PM | P | FAIL |
|
|
1) 160# poly min. 2) two worm drive clamps at each joint 3) no black nipples allowed in water piping systems called contractor and left a notice
|
PLM16-00671
| Plumbing Rough-in | 3/1/2016 | 3/1/2016 | 3/1/2016 1:30:09 PM | P | PASS |
|
|
ri ok
|
PLM16-00667
| Other | 3/1/2016 | 3/1/2016 | 3/1/2016 1:23:46 PM | P | PART |
|
|
12:30 PM met with Eric and the remodel contractor. told the contractor to bring a floor plan to plan review and see what they would need to get a building permit.
|