ELE12-00989
| ELE-Aging Inspection | 3/1/2016 | 3/1/2016 | 3/2/2016 9:52:40 AM | | PASS |
|
|
called and left a message
|
ELE13-00625
| ELE-Aging Inspection | 3/1/2016 | 3/1/2016 | 3/2/2016 9:47:57 AM | | PASS |
|
|
Called and left a message
|
ELE16-00503
| Final | 3/1/2016 | 3/1/2016 | 3/1/2016 2:14:36 PM | P | FAIL |
|
|
Darik Phone #: ###-#### 334.12(b)(4) type NM cable shall not be used in a wet location 314.23 (a) an enclosure mounted to a structure shall rigidly fastened
|
ELE16-00254
| Electrical Rough-In | 3/1/2016 | 3/1/2016 | 3/1/2016 2:01:03 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Buster Bowen walls only ok cover
|
ELE16-00254
| Electrical Rough-In | 3/1/2016 | 3/1/2016 | 3/1/2016 1:58:58 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Buster Bowen 590.6 (2) receptacle outlets existing or installed as permanent wiring shall have GFCI protection, discussed this with the general and wireman in charged. They stated they will be removed or replace receptacles with GFCI protection.
|
ELE16-00624
| Final | 3/1/2016 | 3/1/2016 | 3/1/2016 12:44:16 PM | P | FAIL |
|
|
Overhead temporary pole Phone #: ###-#### Inspection requested via web by Eric Brown idaho power requires meters to ba 5'-6" (+or-6") to center of meter. Meter is to high it is at 6' 7" to center
|
ELE16-00542
| Rough-In Permanent Service | 2/29/2016 | 3/1/2016 | 3/1/2016 12:10:24 PM | A | PASS |
|
|
Service and interior are ready for inspection. I will not be on site. Ground rod added, receptacle added in basement, wiring moved off studs in basement. Call me if any needs, thanks Kurt Phone #: ###-#### Inspection requested via web by Kurt Carlson rough-in ok cover p/s o/h n ok
|
ELE16-00553
| Temporary Service | 2/29/2016 | 3/1/2016 | 3/1/2016 11:38:22 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Traudt t/s o/h n ok
|
ELE16-00075
| Rough-In Permanent Service | 3/1/2016 | 3/1/2016 | 3/1/2016 10:51:07 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Shaun Kirkman wui zone soffit lights confirmed with 2hr fire rating boxes rough-in ok cover p/s u/g n ok
|
ELE15-04045
| Final | 3/1/2016 | 3/1/2016 | 3/1/2016 10:30:54 AM | A | FAIL |
|
|
please give me half an hour notice before inspection to insure access Thank you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman 210.52 (b)(3) penislar counter top required to havea receptacle 406.5 receptacle mounting shall be rigidly held in place 406.6 faceplates required
|
ELE15-00629
| Final | 2/26/2016 | 3/1/2016 | 3/1/2016 10:05:10 AM | A | FAIL |
|
|
would like call ahead; Shane Phone #: ###-#### 210.8 all receptacles serving counter top in a kitchen shall have GFCI protection 210.12 AFCI protection required for smoke detectors 334.12 type NM cable shall not be used in a wet location
|
ELE15-00450
| Electrical Rough-In | 2/29/2016 | 3/1/2016 | 3/1/2016 9:43:54 AM | A | PASS |
|
|
Restroom r/i - Max Phone #: ###-#### bathroom cielings ok cover
|
ELE16-00601
| Final | 2/29/2016 | 3/1/2016 | 3/1/2016 9:12:04 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Brandon Hillman they are leaving existing pole for another home will reinpsect when power is disconnected
|