FIR15-00795
| INSP-Sprinkler Rough-in | 2/29/2016 | 3/1/2016 | 3/1/2016 4:27:45 PM | P | FAIL |
|
|
Rough to cover inspection performed, cover is not approved, numorous hangers are overspaced, hanger spacing needs to be corrected throughout entire building before cover is approved.
|
BLD16-00204
| FIRE-Final Inspection | 3/1/2016 | 3/1/2016 | 3/1/2016 3:58:08 PM | P | PART |
|
|
Fire sprinkler has current inspection tag, fire extinguishers have current inspection tags. Exit lights have been repaired and are now functional. Emergency egress lighting has been repaired and are now functional. Final item for repair is the smoke detector missing located in the basement and inspection of smoke curtian operation on each floor for the elevator.
|
FIR15-00865
| INSP-Sprinkler Rough-in | 2/29/2016 | 3/1/2016 | 3/1/2016 2:45:55 PM | P | FAIL |
|
|
End of line seismic bracing missing on northwest branchlines.
|
FIR15-00865
| INSP-Supply line flush | 2/29/2016 | 3/1/2016 | 3/1/2016 2:44:03 PM | P | DONE |
|
|
Underground main supply line flush complete
|
FIR15-00793
| INSP-Sprinkler Rough-in | 3/1/2016 | 3/1/2016 | 3/1/2016 1:50:46 PM | P | PASS |
|
|
Rough to cover inspection performed on 18NOV2015 for underground piping, underground was approved for cover at that inspection.
|
FIR15-00633
| INSP-Final Inspection | 2/29/2016 | 3/1/2016 | 3/1/2016 11:52:36 AM | A | FAIL |
|
|
Final inspection cannot be completed, missing fire sprinkler head for attached storage area located on the east side of building (there is an open outlet in the southeast room that is for the fire sprinkler head in the storage area) The underground flush has not been accomplished. No hydrostatic test has been performed for the overhead fire sprinkler piping. At time of inspection there is was no exterior bell for the fire department connection. Exterior tamper switch and water flow switch will need to be tested during the fire alarm inspection (Fire alarm pemit number is FIR16-00018). No tamper switches are installed on the fire sprinkler backflow, tamper switches need to be installed. Fire sprinkler headbox needs to be installed in fire sprinkler riser room. Fire sprinkler backflow needs to tested by a licensed backflow tester. Loose/pulled free hangers will need to be repaired. City approved drawings were not on site at time of final inspection, contractor will need to provide city approved drawings for next inspection. The door to the riser room needs to be labeled "FIRE SPRINKLER RISER ROOM"
|
FIR15-00819
| INSP-Final Inspection | 2/26/2016 | 3/1/2016 | 3/1/2016 10:10:39 AM | A | PASS |
|
|
Final fire alarm inspection passed/complete
|