FIR18-00140
| INSP-Sprinkler Rough-in/Hydro | 3/1/2018 | 3/1/2018 | 3/1/2018 3:32:28 PM | P | PART |
|
|
Of the two systems the north side passed the overhead hydro. The south side system failed due to visable loss at the guage.
Please call Anthony before heading out, thank you! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR18-00040
| INSP-Sprinkler Rough-in/Hydro | 3/1/2018 | 3/1/2018 | 3/1/2018 2:45:28 PM | P | CANC |
|
|
Mark Jensen is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD18-00673
| FIRE-Final Inspection | 3/1/2018 | 3/1/2018 | 3/1/2018 2:44:51 PM | P | FAIL |
|
|
Mount the fire extinguishers as discussed on the main level and upper level. Remove the dead bolt from the main exit and provide keyed if wanted. Provide ADA single action hardware for the main exit as discussed.
Jane Phone #: ###-####
|
FIR17-00607
| INSP-Final Inspection | 2/27/2018 | 3/1/2018 | 3/1/2018 1:52:26 PM | A | PASS |
|
|
Permit finaled, Forward flush passed
|
BLD16-02979
| FIRE-Final Inspection | 2/28/2018 | 3/1/2018 | 3/1/2018 1:51:06 PM | A | PASS |
|
|
Life safety passed
Steve Phone #: ###-####
|
FIR16-00785
| INSP-Final Inspection | 3/1/2018 | 3/1/2018 | 3/1/2018 1:50:30 PM | P | PASS |
|
|
Permit finaled
|
BLD17-04218
| FIRE-Conference | 2/28/2018 | 3/1/2018 | 3/1/2018 1:20:08 PM | A | DONE |
|
|
We went over issues with lack of sprinkler coverage which was agreed to be taken care of with the vanilla finish permit and the need for a possible plan modification for the west exit/canopy exiting system.
|
FIR17-00445
| INSP-Sprinkler Rough-in | 2/28/2018 | 3/1/2018 | 3/1/2018 1:08:41 PM | A | PASS |
|
|
Rough-in and tenting passed. Piping can be covered.
Late morning if possible Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR17-00733
| INSP-Final Inspection | 2/28/2018 | 3/1/2018 | 3/1/2018 11:26:11 AM | A | FAIL |
|
|
Todays inspection was a walk through. I verified the head end equipment. I noted that plans need to be resubmitted for a plan modification due to 14 guage wire being used where as 12 guage was submitted. Also there are additional notification devices needed and many devices that need to be relocated or candella increased. The second floor wall layout at the east end does not match the plans. There is an access controled egress lock on the second floor that will need connected to the fire alarm system or contact will need to be made to the building code official. No devices have been tested.
John Howard - Technician Phone #: ###-#### Inspection requested via web by John Siewert
|
FIR17-00559
| INSP-Final Inspection | 2/28/2018 | 3/1/2018 | 3/1/2018 8:43:40 AM | A | PASS |
|
|
Permit finaled
Call prior to going Phone #: 2089853303 >> Inspection requested via mobile web by Mike Kroll
|
FIR17-00541
| INSP-Final Inspection | 2/28/2018 | 3/1/2018 | 2/28/2018 3:16:52 PM | A | CANC |
|
|
Fire final for 10 AM. Rick Fry Phone #: ###-#### >> Inspection requested via web by Nathan Stenquist Inspection cancelled from web by: Nathan Stenquist
|