Inspections for the day of: Thursday, March 1, 2018.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00140 INSP-Sprinkler Rough-in/Hydro3/1/20183/1/20183/1/2018 3:32:28 PMPPART
Of the two systems the north side passed the overhead hydro. The south side system failed due to visable loss at the guage.


Please call Anthony before heading out, thank you! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR18-00040 INSP-Sprinkler Rough-in/Hydro3/1/20183/1/20183/1/2018 2:45:28 PMPCANC
Mark Jensen is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-00673 FIRE-Final Inspection3/1/20183/1/20183/1/2018 2:44:51 PMPFAIL
Mount the fire extinguishers as discussed on the main level and upper level. Remove the dead bolt from the main exit and provide keyed if wanted. Provide ADA single action hardware for the main exit as discussed.


Jane Phone #: ###-####
FIR17-00607 INSP-Final Inspection2/27/20183/1/20183/1/2018 1:52:26 PMAPASS
Permit finaled, Forward flush passed
BLD16-02979 FIRE-Final Inspection2/28/20183/1/20183/1/2018 1:51:06 PMAPASS
Life safety passed

Steve Phone #: ###-####
FIR16-00785 INSP-Final Inspection3/1/20183/1/20183/1/2018 1:50:30 PMPPASS
Permit finaled
BLD17-04218 FIRE-Conference2/28/20183/1/20183/1/2018 1:20:08 PMADONE
We went over issues with lack of sprinkler coverage which was agreed to be taken care of with the vanilla finish permit and the need for a possible plan modification for the west exit/canopy exiting system.
FIR17-00445 INSP-Sprinkler Rough-in2/28/20183/1/20183/1/2018 1:08:41 PMAPASS
Rough-in and tenting passed. Piping can be covered.


Late morning if possible Phone #: ###-#### Inspection requested via web by Sam Ball
FIR17-00733 INSP-Final Inspection2/28/20183/1/20183/1/2018 11:26:11 AMAFAIL
Todays inspection was a walk through. I verified the head end equipment. I noted that plans need to be resubmitted for a plan modification due to 14 guage wire being used where as 12 guage was submitted. Also there are additional notification devices needed and many devices that need to be relocated or candella increased. The second floor wall layout at the east end does not match the plans. There is an access controled egress lock on the second floor that will need connected to the fire alarm system or contact will need to be made to the building code official. No devices have been tested.

John Howard - Technician Phone #: ###-#### Inspection requested via web by John Siewert
FIR17-00559 INSP-Final Inspection2/28/20183/1/20183/1/2018 8:43:40 AMAPASS
Permit finaled


Call prior to going Phone #: 2089853303 >> Inspection requested via mobile web by Mike Kroll
FIR17-00541 INSP-Final Inspection2/28/20183/1/20182/28/2018 3:16:52 PMACANC
Fire final for 10 AM. Rick Fry Phone #: ###-#### >> Inspection requested via web by Nathan Stenquist Inspection cancelled from web by: Nathan Stenquist