BLD99-02771
| BLD-Framing/Rough-in | 3/9/2000 | 3/10/2000 | 3/10/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/09/2000 at 09:00:38. Contact: ###-####.
|
BLD99-02771
| BLD-Other | 3/9/2000 | 3/10/2000 | 3/10/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/09/2000 at 09:02:58. Contact: ###-####.
|
BLD99-02771
| BLD-Energy code compliance | 3/9/2000 | 3/10/2000 | 3/10/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/09/2000 at 09:03:42. Contact: ###-####.
|
BLD00-00015
| BLD-Final | 3/9/2000 | 3/10/2000 | 3/10/2000 12:00:00 AM | A | FAIL |
|
|
jim###-#### the door is unlock Need smoke detectors, and plans. 3/14/00 11:56:21 AM
|
MEC00-00738
| Pressure Test | 3/9/2000 | 3/10/2000 | 3/10/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/09/2000 at 15:14:42. Contact: ###-####.
|
BLD99-02051
| BLD-Framing/Rough-in | 3/9/2000 | 3/10/2000 | 3/10/2000 12:00:00 AM | A | FAIL |
|
|
###-#### Exterior wall 2hr area separation, need detail for eaves running parallel. 3/14/00 11:56:07 AM
|
BLD99-03704
| BLD-Final | 3/10/2000 | 3/10/2000 | 3/10/2000 12:00:00 AM | A | FAIL |
|
|
Posted C/N need all other signatures and fire wall on opposite side to deck.
|
BLD99-01763
| BLD-Final | 3/9/2000 | 3/10/2000 | 3/10/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/09/2000 at 16:00:48. Contact: ###-####.
|
BLD00-00028
| BLD-Foundation | 3/9/2000 | 3/10/2000 | 3/10/2000 12:00:00 AM | P | PASS |
|
|
###-#### Ok letter from soilds engineer. 3/14/00 11:12:48 AM
|
BLD00-00205
| BLD-Final | 3/10/2000 | 3/10/2000 | 3/10/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-00207
| BLD-Final | 3/10/2000 | 3/10/2000 | 3/10/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-00206
| BLD-Final | 3/10/2000 | 3/10/2000 | 3/10/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-00208
| BLD-Final | 3/10/2000 | 3/10/2000 | 3/10/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-00237
| BLD-Final | 3/10/2000 | 3/10/2000 | 3/10/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC00-00812
| Final | 3/10/2000 | 3/10/2000 | 3/10/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/10/2000 at 09:39:31. Contact: ###-####.
|
BLD00-00499
| BLD-Final | 3/10/2000 | 3/10/2000 | 3/10/2000 12:00:00 AM | P | PASS |
|
|
|