Inspections for the day of: Wednesday, March 10, 2004.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR03-00558 INSP-Final Inspection3/9/20043/10/20043/10/2004 12:00:00 AMAPASS
fire sprinklers finaled 3/10/2004 8:28:15 AM
BLD03-01197 FIRE-Final Inspection3/9/20043/10/20043/10/2004 12:00:00 AMAPASS
Fire life safety finaled 3/10/2004 8:29:07 AM
BLD02-03053 FIRE-Final Inspection3/9/20043/10/20043/10/2004 12:00:00 AMAFAIL
Duct smoke detectors have been installed but they do not shut down the hvac units when activated 3/10/2004 9:57:06 AM
MIS04-00075 FIR-Final3/9/20043/10/20043/10/2004 12:00:00 AMAFAIL
Provide annual inspection for the fire extinguisher, remove the deadbolts from the doors. Provide sticker at the main exit. Remove the thumbturn from the main exit. 3/10/2004 9:08:00 AM
BLD03-00602 FIRE-Conference3/9/20043/10/20043/10/2004 12:00:00 AMAPASS
First floor sprinkler piping ok to cover in the hard lid areas 3/10/2004 11:32:00 AM
FIR03-00484 INSP-Final Inspection3/10/20043/10/20043/10/2004 12:00:00 AMAPASS
Fire sprinklers finaled
BLD03-00602 BLD-Conference3/9/20043/10/20043/10/2004 12:00:00 AMPPASS
rooms where risers to 2nd and 3rd floor ok to cover 3/10/2004 4:12:29 PM
FIR03-00806 INSP-Sprinkler Rough-in/Hydro3/9/20043/10/20043/10/2004 12:00:00 AMPPART
Inspection was for the start of the 24 hour air test. Piping in the attic is at 49psi and the riser is at 46psi 3/10/2004 3:04:56 PM
FIR03-00713 INSP-Final Inspection3/9/20043/10/20043/10/2004 12:00:00 AMPPASS
Fire sprinklers finaled 3/10/2004 2:20:31 PM