FIR04-00756
| FIR-Aging Inspection | 3/10/2005 | 3/10/2005 | 3/10/2005 12:00:00 AM | | NR |
|
|
Per Mike the system is installed but they are waiting on the tie into the existing fire alarm sytem 3/10/2005 3:44:31 PM
|
FIR04-00219
| INSP-Final Inspection | 3/8/2005 | 3/10/2005 | 3/10/2005 12:00:00 AM | A | FAIL |
|
|
Need to final both FIR pemits, add exit sign and emergency light in stairwell and repair the exit lights in the tenant space. Test em all when done 3/10/2005 9:59:42 AM
|
BLD04-02711
| FIRE-Final Inspection | 3/9/2005 | 3/10/2005 | 3/10/2005 12:00:00 AM | A | PASS |
|
|
fire life safety finaled 3/10/2005 9:21:49 AM
|
BLD04-02975
| FIRE-Final Inspection | 3/9/2005 | 3/10/2005 | 3/10/2005 12:00:00 AM | A | PASS |
|
|
fire life safety finaled 3/10/2005 11:25:41 AM
|
FIR05-00081
| INSP-Final Inspection | 3/9/2005 | 3/10/2005 | 3/10/2005 12:00:00 AM | A | PASS |
|
|
fire alarm finaled 3/10/2005 11:55:00 AM
|
BLD05-00012
| FIRE-Final Inspection | 3/9/2005 | 3/10/2005 | 3/10/2005 12:00:00 AM | A | FAIL |
|
|
Delete one exit sign and relocate another in the existing area as discussed and per approved plans 3/10/2005 8:53:10 AM
|
FIR05-00008
| INSP-Final Inspection | 3/9/2005 | 3/10/2005 | 3/10/2005 12:00:00 AM | A | PASS |
|
|
Fire sprinklers finaled 3/10/2005 1:44:30 PM
|
BLD04-02824
| FIRE-Final Inspection | 3/9/2005 | 3/10/2005 | 3/10/2005 12:00:00 AM | A | FAIL |
|
|
Provide approved door hardware on both doors. Provide fire extinguisher per review comments. 3/10/2005 12:33:29 PM
|
BLD04-01073
| FIRE-Final Inspection | 3/9/2005 | 3/10/2005 | 3/10/2005 12:00:00 AM | A | PASS |
|
|
Fire life safety finaled 3/10/2005 1:57:31 PM
|
FIR04-00186
| INSP-Final Inspection | 3/10/2005 | 3/10/2005 | 3/10/2005 12:00:00 AM | A | FAIL |
|
|
Missing ceiling tile and canopies.
|
FIR04-00219
| INSP-Final Inspection | 3/10/2005 | 3/10/2005 | 3/10/2005 12:00:00 AM | A | FAIL |
|
|
Instead on one notification circuit there are now two. NAC 2 and NAC 10. Resubmit plans for approval
|
BLD04-02124
| FIRE-Final Inspection | 3/10/2005 | 3/10/2005 | 3/10/2005 12:00:00 AM | A | PASS |
|
|
Fire life safety finaled
|
FIR05-00031
| INSP-Final Inspection | 3/10/2005 | 3/10/2005 | 3/10/2005 12:00:00 AM | A | PASS |
|
|
fire sprinkler finaled
|
FIR05-00063
| INSP-Final Inspection | 3/10/2005 | 3/10/2005 | 3/10/2005 12:00:00 AM | P | PART |
|
|
A temporary occupancy was given with Renn Ross's permission. Fire alarm has been pretested and just needs to be witnessed by the fire inspector.
|
BLD04-02809
| FIRE-Final Inspection | 3/10/2005 | 3/10/2005 | 3/10/2005 12:00:00 AM | P | PART |
|
|
A temporary occupancy was given with Renn Ross's permission. Fire alarm has been pretested and just needs to be witnessed by the fire inspector. Fire life safety is ok to final when the fire alarm is approved.
|
FIR04-00689
| INSP-Final Inspection | 3/10/2005 | 3/10/2005 | 3/10/2005 12:00:00 AM | P | PASS |
|
|
Fire sprinkler finaled
|
BLD04-02887
| FIRE-Conference | 3/10/2005 | 3/10/2005 | 3/10/2005 12:00:00 AM | P | DONE |
|
|
Contractor had questions about the fire rated corridor. 3/10/2005 4:35:47 PM
|
FIR04-00593
| INSP-Sprinkler Rough-in/Hydro | 3/10/2005 | 3/10/2005 | 3/10/2005 12:00:00 AM | P | PASS |
|
|
Hydro test for the underground passed. Done by Bill Alexander. 3/10/2005 3:42:56 PM
|
FIR04-00666
| INSP-Sprinkler Rough-in/Hydro | 3/9/2005 | 3/10/2005 | 3/10/2005 12:00:00 AM | P | PASS |
|
|
Hydro test for the wet system, dry system and the underground supply passed. Still need to hydro the header and the fdc. Also need the 24 hour air test on the dry system done. 3/10/2005 3:40:47 PM
|
BLD04-02124
| FIRE-Final Inspection | 3/10/2005 | 3/10/2005 | 3/10/2005 12:00:00 AM | P | PASS |
|
|
life safety finaled 3/10/2005 11:06:35 AM
|