Inspections for the day of: Friday, March 10, 2006.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00125 INSP-Alarm Testing3/9/20063/10/20063/10/2006 5:10:47 PMPPASS
Fire alarm work passed field inspection.
BLD01-01632 FIRE-Final Inspection3/10/20063/10/20063/10/2006 4:58:14 PMPNR
Project is not ready for final inspection per discussion with contractor.
FIR05-00817 INSP-Final Inspection3/10/20063/10/20063/10/2006 3:06:10 PMPFAIL
Heads at two locations are painted and will require replacement at the confrence room 101 and office 102, surface mounted lights in the work room 104 obstruct two sprinklers at this location.
FIR05-00425 INSP-Final Inspection3/8/20063/10/20063/10/2006 2:15:13 PMPFAIL
Standpipe flow test failed to supply the required flow and residual pressure needed. Some c/n items related to the fire pump inspected including test of low fuel supervision device, aux. tank valves have been installed, lock provided on fuel line, heads above aux. tank. Still need flow performance curve data, missing stop button, tags on risers, dry system air compressors set, perform the remainder of alarm testing related to fire sprinkler systems.
FIR05-00425 INSP-Sprinkler Rough-in/Hydro3/8/20063/10/20063/10/2006 2:04:34 PMAPART
Two hour hydrostatic test for the standpipes in stairwells one and two passed inspection.
BLD06-00315 FIRE-Final Inspection3/9/20063/10/20063/10/2006 2:02:32 PMAPASS
Fire life safety for the permitted work is satisfactory, note-need to seal hole in the rated wall where the sprinkler line was removed prior to structural final inspection.
FIR06-00096 INSP-Final Inspection3/10/20063/10/20063/10/2006 1:58:16 PMPPASS
Fire alarm permit finaled.
FIR06-00097 INSP-Final Inspection3/10/20063/10/20063/10/2006 1:57:32 PMPPASS
Fire sprinkler permit finaled.
FIR06-00097 INSP-Sprinkler Rough-in3/9/20063/10/20063/10/2006 12:52:10 PMAPASS
Fire sprinkler work is satisfactory.
FIR06-00096 INSP-Alarm Testing3/9/20063/10/20063/10/2006 12:48:07 PMAPASS
Fire alarm work passed inspection.
FIR06-00096 INSP-Sprinkler Rough-in/Hydro3/9/20063/10/20063/10/2006 12:43:09 PMADEFR
Duplicate inspection request.
FIR06-00010 INSP-Final Inspection3/10/20063/10/20063/10/2006 11:11:48 AMAPASS
Fire sprinkler permitted demo work has previously been inspected and is acceptable. Permit finaled.
BLD05-00775 FIRE-Final Inspection3/9/20063/10/20063/10/2006 11:07:18 AMANR
The project related fire sprinkler and alarm permit work must be finaled prior to life safety final inspection and approval.
FIR05-00880 INSP-Final Inspection3/8/20063/10/20063/10/2006 11:03:40 AMAPART
c/n items have been completed, all items tested except two AHU detectors which are not installed at this time, provide signage on the door to the FACP.
FIR05-00695 INSP-Alarm Testing3/9/20063/10/20063/10/2006 10:36:52 AMACANC
inspection scheduled to wrap up garage devices; Phone #: ###-#### Internet Inspection Request from: Terry Owsley Inspection cancelled from web by: Terry Owsley
FIR06-00141 INSP-Sprinkler Rough-in3/8/20063/10/20063/10/2006 9:09:48 AMAPART
Overhead rough-in is good for cover at the new board room, final pending installation of ceiling and escutcheons.
FIR05-00428 INSP-Final Inspection3/9/20063/10/20063/10/2006 9:05:48 AMAPART
All areas inspected are satisfactory, final pending replacement of one painted head in the restroom (see enlarged detail E for location), and installation of missing escutcheons at the restroom and office area at the end of the NE wing.
FIR05-00425 INSP-Final Inspection3/3/20063/10/20063/8/2006 4:55:44 PMACANC
Contact Charles - TOC inspection; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley