FIR05-00771
| INSP-Sprinkler Rough-in/Hydro | 3/10/2006 | 3/10/2006 | 3/10/2006 3:50:13 PM | | PASS |
|
|
Wet system hydro test passed. Need copy of the test papers.
|
FIR05-00428
| INSP-Final Inspection | 3/10/2006 | 3/10/2006 | 3/10/2006 2:14:16 PM | P | PASS |
|
|
permit finaled
|
FIR06-00040
| INSP-Final Inspection | 3/9/2006 | 3/10/2006 | 3/10/2006 11:57:01 AM | A | FAIL |
|
|
Duct work is still blocking the upright head.
|
FIR05-00571
| INSP-Final Inspection | 3/10/2006 | 3/10/2006 | 3/10/2006 11:56:34 AM | A | FAIL |
|
|
Sidewall sprinkler heads are still over spaced and all of the heads are still taped from the painters.
|
FIR06-00056
| INSP-Sprinkler Rough-in/Hydro | 3/9/2006 | 3/10/2006 | 3/10/2006 11:55:43 AM | A | FAIL |
|
|
Need to meet with the contractor to go over the new head spacing.
|
FIR06-00120
| INSP-Sprinkler Rough-in/Hydro | 3/9/2006 | 3/10/2006 | 3/10/2006 8:45:22 AM | A | PASS |
|
|
Underground piping is ok to cover
|