BLD08-00243
| BLD-Concrete | 3/10/2008 | 3/10/2008 | 3/10/2008 5:26:19 PM | P | PART |
|
|
TONY Phone #: ###-#### N and W walls Ok
|
MIS08-00030
| BLD-Final | 3/10/2008 | 3/10/2008 | 3/10/2008 5:14:09 PM | P | PASS |
|
|
Final OK
|
MIS08-00030
| DOC - Permit Finaled | 3/10/2008 | 3/10/2008 | 3/10/2008 5:13:48 PM | P | PASS |
|
|
|
BLD05-03491
| BLD-Final | 3/10/2008 | 3/10/2008 | 3/10/2008 3:57:23 PM | A | PEND |
|
|
Called Chad Crocker......Needs to get all finals for shell..........
|
BLD07-00305
| BLD-Foundation | 3/10/2008 | 3/10/2008 | 3/10/2008 3:43:16 PM | P | PART |
|
|
EN Phone #: ###-#### N.W. E. and part of South wall
|
BLD07-03002
| BLD-Framing/Rough-in | 3/10/2008 | 3/10/2008 | 3/10/2008 3:21:30 PM | P | PASS |
|
|
DENNIS ###-#### Phone #: ###-####
|
MIS08-00039
| BLD-Conference | 3/10/2008 | 3/10/2008 | 3/10/2008 3:21:11 PM | P | DONE |
|
|
This is for a home purchase. Please contact Becci at the number provided at least 1/2 hour before arriving so she can provide access. Thank you! Phone #:
###-#### Internet Inspection Request from: Connie LaFrainer Corrections......too many to list........see hard copy.
|
BLD05-02539
| BLD-Conference | 3/10/2008 | 3/10/2008 | 3/10/2008 3:19:27 PM | P | CANC |
|
|
mike Phone #: ###-####
|
BLD06-01198
| BLD-Conference | 3/10/2008 | 3/10/2008 | 3/10/2008 11:56:00 AM | A | DONE |
|
|
Mike at ###-#### Work in progress.
|
BLD07-02658
| BLD-Footing | 3/7/2008 | 3/10/2008 | 3/10/2008 11:27:39 AM | A | PASS |
|
|
jeff - after 8:30 please Phone #: ###-#### or ###-#### Looked at small footing at North side of house.....OK per detail.....used 2 part epoxy....advised to fill solid blocking in areas needed for point load transfer ie......Floor joist and Vent.
|