ELE07-03950
| Electrical Rough-In | 3/10/2008 | 3/10/2008 | 3/10/2008 4:09:18 PM | P | CANC |
|
|
1st floor south wall inspection Phone #: ###-#### Internet Inspection Request from: Celinda Winters see conference
|
ELE07-03950
| Conference | 3/10/2008 | 3/10/2008 | 3/10/2008 4:09:08 PM | P | DONE |
|
|
1st floor south wall inspection Phone #: ###-#### Internet Inspection Request from: Celinda Winters met electrician, explained that the wall they asked for was not on this core and shell permit and that they have to get a tenant improvement permit. Met builder and they expect to get bld later, then electrician can get his permit, so they won't ask for inspections until permits are in order, and the electrician can only do core and shell work.
|
ELE06-03694
| Final | 3/10/2008 | 3/10/2008 | 3/10/2008 3:08:40 PM | P | PASS |
|
|
looked at sign, ok to final
|
ELE06-04165
| ELE-Aging Inspection | 3/10/2008 | 3/10/2008 | 3/10/2008 2:59:55 PM | | DONE |
|
|
see final
|
ELE06-04165
| Final | 3/10/2008 | 3/10/2008 | 3/10/2008 2:59:47 PM | P | PASS |
|
|
ok to final
|
ELE08-00087
| Final | 3/7/2008 | 3/10/2008 | 3/10/2008 2:12:08 PM | P | PASS |
|
|
Final Inspect. Please call Mike Zaccheo for access. Phone #: ###-#### Internet Inspection Request from: Kristopher Wilson ok to final, signed occupancy card
|
ELE08-00263
| Final | 3/10/2008 | 3/10/2008 | 3/10/2008 1:25:44 PM | P | CANC |
|
|
Final Underground inspection. Bruce is contact. Phone #: ###-#### Internet Inspection Request from: Barbara Palmer wrong type inspection request, see ri
|
ELE08-00263
| Electrical Rough-In | 3/10/2008 | 3/10/2008 | 3/10/2008 1:25:26 PM | P | PASS |
|
|
Final Underground inspection. Bruce is contact. Phone #: ###-#### Internet Inspection Request from: Barbara Palmer called contractor, ok to pour slab (added floor boxes and rigid conduit)
|
ELE08-00334
| Final | 3/10/2008 | 3/10/2008 | 3/10/2008 12:47:19 PM | P | PASS |
|
|
Please give me at least 30 minutes to make sure someone can be here to let you in. Thank you Shaun ###-#### Phone #: ###-#### Internet Inspection Request from: Shaun Kirkman ok to final
|
ELE08-00564
| Electrical Rough-In | 3/6/2008 | 3/10/2008 | 3/10/2008 10:39:20 AM | A | FAIL |
|
|
Please inspect GFCI on ext by front door,electrician is Mike Mccarrel, # is ###-#### Phone #: ###-#### Internet Inspection Request from: gary batten called contractor, left message, BCC no violations shall be retained, panel schedule and open breaker knock-outs in panel, add to permit correct number of rooms worked in,and fees, Nec 110.3(B) gfci shall operate with tester
|
ELE07-02768
| Final | 3/10/2008 | 3/10/2008 | 3/10/2008 10:22:25 AM | A | PASS |
|
|
Jim ###-#### called, corrections made, ok to final
|
ELE07-03868
| Electrical Rough-In | 3/7/2008 | 3/10/2008 | 3/10/2008 9:56:00 AM | A | FAIL |
|
|
Underground inspection. Trenching and pipe for sign and pole bases Phone #: ###-#### Internet Inspection Request from: Paula Gietzen called contractor, left correction notice and card, BCC shall not cover u/g before inspection, shall provide proper bedding per NEC 300.5, no rocks in u/g. see 1st pole base on right middle of lot for do not cover card
|
ELE07-01088
| Final | 3/7/2008 | 3/10/2008 | 3/10/2008 9:14:36 AM | A | PART |
|
|
SHAWN NOTE: PARTIAL FINAL Phone #: ###-#### looked at east side up and down, talked about strapping, labels, open neutral in outlet, box covers, left correction notice NEC 110.26 shall provide work space about electrical equipment; all paragraphs, all electrical- see outside air handlers and mechanical rooms
|