FIR08-00018
| INSP-Sprinkler Rough-in/Hydro | 3/9/2009 | 3/10/2009 | 3/10/2009 5:07:00 PM | A | PART |
|
|
Main corridors on floors 14, 15 and 16 approved for cover, suite 1105 also okay for cover-notes per T. Frost.
|
BLD08-01151
| FIRE-Conference | 3/10/2009 | 3/10/2009 | 3/10/2009 4:59:41 PM | P | DONE |
|
|
Regarding exceptions allowed per NFPA 13 standard for combustible concealed spaces.
|
BLD08-01097
| FIRE-Conference | 3/10/2009 | 3/10/2009 | 3/10/2009 4:58:08 PM | P | DONE |
|
|
Regarding balance of site inspections for project final.
|
FIR08-00797
| INSP-Sprinkler Rough-in | 3/10/2009 | 3/10/2009 | 3/10/2009 4:56:47 PM | P | PART |
|
|
Overhead system modifications for the library and mail rooms are approved for cover, previous correction notice items okayed at the existing corridor.
|
FIR06-00028
| INSP-Final Inspection | 3/9/2009 | 3/10/2009 | 3/10/2009 4:53:11 PM | A | PASS |
|
|
Field testing for relocated tools in rooms 161A and 161B for suppression system monitoring completed satisfactory, fire alarm permit finaled.
|