Inspections for the day of: Wednesday, March 10, 2010.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00397 Site Final3/10/20103/10/20103/12/2010 3:10:31 PMPCANC
ESC10-00186 Site Preparation3/10/20103/10/20103/10/2010 4:26:16 PMPPASS
Per the ammendment to the ESC plan, the site is in good condition. All other BMP's have been addressed and instaalled correctly per industry standards.
ESC09-00021 BMP Violation3/8/20103/10/20103/10/2010 3:30:23 PMAPART
Activily removing all material off of the hard surface and will be placing protection back into the inlet.
ESC08-00842 Conference3/10/20103/10/20103/10/2010 3:28:10 PMPDONE
Lefty a message to RP:
Due to the medical issues that the RP is dealing with, the city will make sure that the storm drain inlet is protected and the stop work order is lifted.
ESC08-00842 BMP Violation3/9/20103/10/20103/10/2010 3:07:12 PMAFAIL
Moved to a STOP WORK ORDER.
ESC08-00842 INSP - Stop Work Order3/10/20103/10/20103/10/2010 3:06:46 PMPFAIL
STOP WORK ORDER POSTED:
Message left to the RP;
None of the violations have been corrected from the pervious inspections.
Per the correction Notice all issues must be corrected prior to the the Stop Work Order is lifted.
ESC10-00168 Site Preparation3/10/20103/10/20103/10/2010 2:30:28 PM PASS
ESC09-00539 BMP Violation3/9/20103/10/20103/10/2010 8:16:41 AMAPASS
ESC09-00800 Site Preparation3/10/20103/10/20103/10/2010 8:16:08 AM NR