Inspections for the day of: Thursday, March 10, 2011.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE10-02689 Final3/10/20113/10/20113/10/2011 3:15:10 PMPPASS
ok final
ELE10-02689 ELE-Aging Inspection3/10/20113/10/20113/10/2011 3:13:31 PM DONE
see final
ESC11-00091 General Inspection3/10/20113/10/20113/10/2011 3:01:28 PMPNR
ESC10-00913 General Inspection3/10/20113/10/20113/10/2011 2:57:54 PMPCANC
see 460 comments
ELE11-00434 Electrical Rough-In3/10/20113/10/20113/10/2011 2:56:29 PMPPASS
Rough in outlets in walls Phone #: ###-#### >> Inspection requested via web by Emmet Bushman walls ri ok
ESC10-00903 General Inspection3/10/20113/10/20113/10/2011 2:55:52 PMPPASS
looked ok
ESC10-00732 General Inspection3/10/20113/10/20113/10/2011 2:37:03 PMPPASS
looked ok
ESC11-00070 General Inspection3/10/20113/10/20113/10/2011 2:35:30 PMPPASS
looked ok
ELE10-02662 Final3/10/20113/10/20113/10/2011 1:37:39 PMPPASS
ok final
ELE10-02476 Final3/10/20113/10/20113/10/2011 1:20:22 PMPPASS
reinspect Phone #: ###-#### >> Inspection requested via web by chris burke ok final
ELE10-02413 Final3/10/20113/10/20113/10/2011 10:20:07 AMAPASS
ok
ELE11-00419 Final3/9/20113/10/20113/10/2011 9:04:59 AMAFAIL
Phone #: ###-#### >> Inspection requested via web by chris burke called, left message, left correction notice, NEC 240.24 center of operating handle shall not be over 6'-7" above floor, 250.52 shall utilize incoming water pipe as ground and within 5' of entering structure, 250.24 shall connect grounding electrode conductor to grounded conductor in service, NOTE: corrections shall be made within 5 working days or further action will be taken, such as removal of power
ELE10-02476 Final3/9/20113/10/20113/10/2011 8:11:33 AMANH
Phone #: ###-#### >> Inspection requested via web by chris burke called, left message, left card, fee due