GCP13-00194
| GCP-Under Floor | 3/10/2014 | 3/10/2014 | 3/10/2014 4:24:36 PM | P | NR |
|
|
Wes got rained out...........ds
|
GCP14-00040
| GCP-Final | 3/10/2014 | 3/10/2014 | 3/10/2014 4:02:45 PM | P | PASS |
|
|
Gregg ###-####
|
GCP14-00012
| GCP-Final | 3/10/2014 | 3/10/2014 | 3/10/2014 2:39:52 PM | P | PASS |
|
|
Pat ###-####
|
PLM14-00490
| Water and/or Sewer | 3/10/2014 | 3/10/2014 | 3/10/2014 1:52:31 PM | P | PART |
|
|
ron Phone #: ###-#### tie in to sewer stub ok to bury.........ds
|
PLM14-00174
| Groundwork | 3/7/2014 | 3/10/2014 | 3/10/2014 12:15:43 PM | A | PASS |
|
|
if questions call Mike @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann G/W all complete............ds
|
PLM14-00528
| Plumbing Rough-in | 3/10/2014 | 3/10/2014 | 3/10/2014 12:06:26 PM | P | CANC |
|
|
JOB # 17317. Phone #: ###-#### >> Inspection requested via web by Ann Marie Reyes Inspection cancelled from web by: Ann Marie Reyes
|
PLM14-00482
| Final | 3/9/2014 | 3/10/2014 | 3/10/2014 10:38:56 AM | A | PASS |
|
|
access through main door thanks Jimmy Phone #: ###-#### >> Inspection requested via web by James Walsh
|
PLM14-00521
| Plumbing Rough-in | 3/10/2014 | 3/10/2014 | 3/10/2014 10:34:08 AM | P | PASS |
|
|
Job is ready this am. Test will be on drains and waters. RI for shower, aw, pan drain and lavatory basins (2) Thank you. Phone #: ###-#### >> Inspection requested via web by Scott Sparrell
|
PLM13-02789
| PLM-Aging Inspection | 3/10/2014 | 3/10/2014 | 3/10/2014 9:53:36 AM | | NR |
|
|
|
GCP13-00194
| GCP- Rough-in | 3/7/2014 | 3/10/2014 | 3/10/2014 9:43:40 AM | A | NR |
|
|
Patty ###-####
|
PLM14-00521
| Plumbing Rough-in | 3/10/2014 | 3/10/2014 | 3/10/2014 9:25:42 AM | A | CANC |
|
|
|