Inspections for the day of: Monday, March 10, 2014.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00693 INSP-Final Inspection3/10/20143/10/20143/12/2014 3:25:12 PMPPASS
Scope of fire sprinkler work approved for final after corrections and adjustments made. Inspection passed.
BLD13-03468 FIRE-Conference3/10/20143/10/20143/11/2014 4:29:57 PMPDONE
On site conference regarding exit signs, life safety inspection items, etc.
FIR14-00116 INSP-Sprinkler Rough-in3/10/20143/10/20143/10/2014 4:18:45 PMPPART
UG fire supply line stub and ductile riser okayed for bury. *Note- contractor has utilized an existing concrete footing as thrust blocking.
FIR14-00089 INSP-Final Inspection3/7/20143/10/20143/10/2014 4:13:32 PMAPASS
C/N items verified. Fire sprinkler permit final approved.
FIR13-00597 INSP-Sprinkler Rough-in/Hydro3/7/20143/10/20143/10/2014 4:12:12 PMPPART
Overhead hydrostatic test of the new system piping passed.
FIR14-00102 INSP-Final Inspection3/7/20143/10/20143/10/2014 3:36:51 PMAPASS
Final walkthrough passed. Permit finaled.
BLD13-02949 FIRE-Final Inspection3/7/20143/10/20143/10/2014 3:35:42 PMAPASS
Verified C/N items are finished with the exception of door hardware at one pair of main entry/exit doors. This item to be completed prior to structural final as agreed.
BLD13-03479 FIRE-Final Inspection3/10/20143/10/20143/10/2014 3:33:06 PMPPASS
Remainder of permit work completed and passed fire life safety inspection.
FIR14-00128 INSP-Final Inspection3/7/20143/10/20143/10/2014 11:29:47 AMAPASS
Scope of demo work is complete. Fire sprinkler permit finaled.