FIR13-00693
| INSP-Final Inspection | 3/10/2014 | 3/10/2014 | 3/12/2014 3:25:12 PM | P | PASS |
|
|
Scope of fire sprinkler work approved for final after corrections and adjustments made. Inspection passed.
|
BLD13-03468
| FIRE-Conference | 3/10/2014 | 3/10/2014 | 3/11/2014 4:29:57 PM | P | DONE |
|
|
On site conference regarding exit signs, life safety inspection items, etc.
|
FIR14-00116
| INSP-Sprinkler Rough-in | 3/10/2014 | 3/10/2014 | 3/10/2014 4:18:45 PM | P | PART |
|
|
UG fire supply line stub and ductile riser okayed for bury. *Note- contractor has utilized an existing concrete footing as thrust blocking.
|
FIR14-00089
| INSP-Final Inspection | 3/7/2014 | 3/10/2014 | 3/10/2014 4:13:32 PM | A | PASS |
|
|
C/N items verified. Fire sprinkler permit final approved.
|
FIR13-00597
| INSP-Sprinkler Rough-in/Hydro | 3/7/2014 | 3/10/2014 | 3/10/2014 4:12:12 PM | P | PART |
|
|
Overhead hydrostatic test of the new system piping passed.
|
FIR14-00102
| INSP-Final Inspection | 3/7/2014 | 3/10/2014 | 3/10/2014 3:36:51 PM | A | PASS |
|
|
Final walkthrough passed. Permit finaled.
|
BLD13-02949
| FIRE-Final Inspection | 3/7/2014 | 3/10/2014 | 3/10/2014 3:35:42 PM | A | PASS |
|
|
Verified C/N items are finished with the exception of door hardware at one pair of main entry/exit doors. This item to be completed prior to structural final as agreed.
|
BLD13-03479
| FIRE-Final Inspection | 3/10/2014 | 3/10/2014 | 3/10/2014 3:33:06 PM | P | PASS |
|
|
Remainder of permit work completed and passed fire life safety inspection.
|
FIR14-00128
| INSP-Final Inspection | 3/7/2014 | 3/10/2014 | 3/10/2014 11:29:47 AM | A | PASS |
|
|
Scope of demo work is complete. Fire sprinkler permit finaled.
|