BLD14-00197
| BLD-Foundation | 3/10/2014 | 3/10/2014 | 3/10/2014 6:11:51 PM | P | PASS |
|
|
should be ready about 11:00 or so Phone #: ###-#### >> Inspection requested via web by Ben Sears
|
BLD13-02898
| BLD-Final | 3/10/2014 | 3/10/2014 | 3/10/2014 6:11:11 PM | P | PASS |
|
|
call homeowner Jan ###-#### 30prior for access or contractor john @ ###-####
|
BLD13-02898
| DOC - Permit Finaled | 3/10/2014 | 3/10/2014 | 3/10/2014 6:11:00 PM | P | PASS |
|
|
|
BLD14-00301
| BLD-Energy code compliance | 3/10/2014 | 3/10/2014 | 3/10/2014 4:22:26 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Heather Echevarria
|
BLD14-00197
| BLD-Foundation | 3/10/2014 | 3/10/2014 | 3/10/2014 3:48:12 PM | A | PART |
|
|
should be ready about 11:00 or so Phone #: ###-#### >> Inspection requested via web by Ben Sears,, work in progress
|
MIS13-00132
| BLD-Conference | 3/7/2014 | 3/10/2014 | 3/10/2014 3:21:11 PM | A | FAIL |
|
|
status?,, another stop work order issued,, grading hillside without permits,, needs ESC permit,, needs building permit for side shade structure attached to the house (or remove) pictures taken again with personal camera
|
BLD14-00256
| BLD-Footing | 3/7/2014 | 3/10/2014 | 3/10/2014 12:44:24 PM | A | PEND |
|
|
late pm // Pat Phone #: ###-####,, pour called off due to the soil under the supports that are holding up the house appear to be cracking/deteriorating and with it raining it looks too dangerous to be under..
|
BLD14-00301
| BLD-Framing/Rough-in | 3/7/2014 | 3/10/2014 | 3/10/2014 11:52:30 AM | A | PART |
|
|
Phone #: ###-#### >> Inspection requested via web by Heather Echevarria,, ok to insulate
|