Inspections for the day of: Monday, March 10, 2014.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00717 INSP-Sprinkler Rough-in/Hydro3/10/20143/10/20143/11/2014 2:10:43 PMPPART
phase 3 main and branchline rough-in passed. Will still need rough-in inspection for the drops
FIR14-00109 INSP-Sprinkler Rough-in3/10/20143/10/20143/10/2014 3:05:30 PMPPASS
See the city approved plans for locations where the piping can be covered.
FIR14-00120 INSP-Final Inspection3/7/20143/10/20143/10/2014 12:06:59 PMAPASS
permit finaled
FIR13-00633 INSP-Alarm Testing3/6/20143/10/20143/10/2014 10:20:00 AMAPART
See the city approved plans for locations of the smoke detectors tested. They are marked "ok" in red. I also tested/verified the audio/visual devices in this same area. The devices that did not function were the fire/smoke dampers.
FIR13-00701 INSP-Final Inspection3/10/20143/10/20143/10/2014 10:16:43 AMPPASS
permit finaled
BLD13-02770 FIRE-Final Inspection3/10/20143/10/20143/10/2014 10:15:55 AMPPASS
life safety passed
FIR13-00701 INSP-Alarm Testing3/6/20143/10/20143/10/2014 10:14:01 AMAPASS
Permit finaled. Two new strobes added as requested.