Inspections for the day of: Tuesday, March 10, 2015.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE14-02205 ELE-Request for Extension3/10/20153/10/20153/10/2015 3:13:23 PMPPASS
Josh Woodlen Phone #: ###-#### ok for extension
ELE14-03222 Final3/10/20153/10/20153/10/2015 3:09:07 PMPPASS
Need a Final for this job. Lock box code is 4875. Phone #: ###-#### Inspection requested via web by John Edwards ok final
ELE15-00613 Final3/10/20153/10/20153/10/2015 2:43:39 PMPPASS
Phone #: ###-#### Inspection requested via web by steve ragan ok final
ELE15-00386 Rough-In Permanent Service3/10/20153/10/20153/10/2015 2:15:36 PMPPASS
Phone #: ###-#### Inspection requested via web by Eric Brown ri ok, p/s u/g n ok
ELE15-00635 Temporary Service3/10/20153/10/20153/10/2015 1:17:40 PMPPASS
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s u/g n ok
ELE14-03087 Final3/10/20153/10/20153/10/2015 12:41:49 PMPFAIL
Phone #: ###-#### Inspection requested via web by Therrin Robertson called, left message,left correction notice, BCC shall add water feature to permit and schedule inspections, NEC 110 receptacles shall operate-bib ne room, sw bar, 406.5 shall install receptacle and cover in pantry and top stairs, 408 shall install panel cover and schedule
ELE15-00024 Final3/10/20153/10/20153/10/2015 11:32:05 AMPPASS
Garage access code 1979E Phone #: ###-#### Inspection requested via web by Alan Lusk ok final
ELE14-01812 Electrical Rough-In3/10/20153/10/20153/10/2015 10:13:45 AMAPASS
Rough-in inspection IL area A and B 1st floor hard lid corridor and misc rooms A151, B151, B153, B155, B156, and B157. Building permit BLD13-00181. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok cover as requested
ELE15-00616 Final3/9/20153/10/20153/10/2015 9:07:08 AMAPASS
Tim. ###-####. Building is Rocky Mountain Packaging. It is the building directly next to Dixon container. The general contractor said there is a Building permit sign on the fence to entrance of parking lot. New building is in that portion of parking lot Phone #: ###-#### Inspection requested via web by Tim Lawrence ok final
ELE15-00104 Final3/9/20153/10/20153/10/2015 8:40:05 AMAPASS
please call prior to arrival for access. Phone #: ###-#### Inspection requested via web by Patrick Paz ok final