Inspections for the day of: Tuesday, March 10, 2015.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00024 Site Preparation3/10/20153/10/20153/10/2015 3:48:59 PMPPASS
Follow up inspection to see that BMPs have been installed and permit posted.

DI in front of project has now been fitted with sediment filter bag. Wattle has been trenched in at toe of slope and edge of sidewalk. Permit onsite.

Approved.
ESC13-00213 General Inspection3/10/20153/10/20153/10/2015 3:34:10 PM PASS
No activity at time of inspection. No corrections needed.
ESC13-00552 Aging Inspection3/10/20153/10/20153/10/2015 2:29:11 PM PASS
ESC15-00135 Site Preparation3/10/20153/10/20153/10/2015 1:46:36 PMPPASS
Site prep requested by Luke from Syringa



Meet RP on site. BMPs include perimeter straw wattle and preservation of existing grass and trees.

Parcel has Crane Creek running diagonal across lot, the Creek is lined with sandstone bricks and covered by concrete slab. Sandstone channel and slab are to be undisturbed and left as is. To keep vehicles and any stockpiling off the unsupported slab a silt fence will be installed on either side of creek. The house will be west of channel, and the detached garage to the east off the ally.

Permit onsite. BMPs installed. DI on Dewey is clogged with leaves and debris unrelated to construction.
ESC14-00868 Aging Inspection3/10/20153/10/20153/10/2015 12:29:54 PM PEND
No changes or activity at site since prior inspection. Need to check with Syman Company and Knife River to see if the silt fence BMP is remaining installed for future work.

No violations or stormwater pollution sources at site.
ESC13-00755 Random Inspection3/10/20153/10/20153/10/2015 12:02:02 PMPPART
Requested that Lysted Street south of construction entrance receive special sweeping attention today during the on-site sweeper rounds. It appears it has not been swept since last week, or new dirt is tracked out each day.

Petra supervisor JC stated that this afernoon it will be taken care off. Rain is forecasted for tomorrow.

Rest of site is in good condtion with no major trackout or loose sediment areas.
ESC13-00230 General Inspection3/10/20153/10/20153/10/2015 11:56:39 AMPPASS
Inlet protection currently in good condtion. Limited trackout, but will need to do maintenance on construction entrance if that will continue to be a staging/stockpiling area. Currently no issues.

Washout is being used, no windblown trash issues.

Approved.
ESC14-00241 General Inspection3/10/20153/10/20153/10/2015 11:20:34 AM PASS
Wings pool room addition is complete. Site has been cleaned of materials and loose sediment. Temp BMPs removed. ESC permit conditions satisfied. All other permits finaled.
ESC14-00241 DOC - Permit Finaled3/10/20153/10/20153/10/2015 11:19:26 AMPPASS
ESC15-00205 Site Preparation3/6/20153/10/20153/10/2015 10:45:47 AMAPASS
Dan Phone #: ###-####

Permit posted on fence. Loading/unloading will be from Tio Leo, RP will sweep up any trackout. Nearest inlet is over 50 M to the south and is quite flat, waived inlet protection if trackout is cleaned up as it is created.

Small project, low risk, RP familiar with ESC permit conditions. Approved.
ESC14-00908 Aging Inspection3/10/20153/10/20153/10/2015 10:02:47 AM PASS
WIP. Water treatment and filter station walls are constructed. No trackout to Fisk or loose sediment leaving site. No MS4 system on Fisk, but sheet flow goes to Fairview inlets. The canal is protected and currently not flowing.

No corrections.
ESC14-00916 Aging Inspection3/10/20153/10/20153/10/2015 8:25:24 AM PASS
Garage addition complete. No corrections needed at site. BLD permit finaled.
ESC14-00916 DOC - Permit Finaled3/10/20153/10/20153/10/2015 8:24:55 AMPPASS
ESC14-00726 DOC - Permit Finaled3/10/20153/10/20153/10/2015 8:23:11 AMPPASS
Small radio tower and concrete base are complete. Site has been cleaned. All permits finaled.