ELE14-03316
| Rough-In Permanent Service | 3/10/2016 | 3/10/2016 | 3/10/2016 5:34:40 PM | P | CANC |
|
|
Medium Voltage- Xfmer Loop Owners Loop Phone #: ###-#### Inspection requested via web by Tom Betty not ready
|
ELE14-03316
| Conference | 3/10/2016 | 3/10/2016 | 3/10/2016 5:34:04 PM | P | DONE |
|
|
Medium Voltage- Xfmer Loop Owners Loop Phone #: ###-#### Inspection requested via web by Tom Betty Discussed medium voltage conductors installed through vaults,egress doors with panic hardware.
|
ELE16-00089
| Conference | 3/8/2016 | 3/10/2016 | 3/10/2016 1:43:07 PM | A | DONE |
|
|
Discuss installation methods to be used in parking garage area on 3rd floor. Phone #: ###-#### Inspection requested via web by Rafael Castillo rescheduled for monday 3/14/16
|
ELE16-00045
| Final | 3/9/2016 | 3/10/2016 | 3/10/2016 12:08:21 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot job complete, final ok
|
ELE15-03125
| Electrical Rough-In | 3/10/2016 | 3/10/2016 | 3/10/2016 11:33:44 AM | A | PASS |
|
|
underground bonding of pool apron around edge of pool. Thanks Phone #: ###-#### Inspection requested via web by Darryn Coburn rough-in ok cover perimeter equipotential bonding
|
ELE16-00152
| Final | 3/10/2016 | 3/10/2016 | 3/10/2016 10:18:39 AM | A | FAIL |
|
|
Door code 234 Phone #: ###-#### Inspection requested via web by Chris Chesnut Not all corrections have been completed.
|
ELE16-00749
| Permanent Service | 3/9/2016 | 3/10/2016 | 3/10/2016 9:42:56 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Monica Lehman Stop work order, other trades working without appropriate permits and inspections.
|