MIS16-00397
| BLD-Conference | 1/20/2017 | 3/3/2017 | | A | |
|
|
Check on progres/status.
|
BLD17-00573
| BLD-Conference | 3/10/2017 | 3/10/2017 | 3/10/2017 3:41:51 PM | P | DONE |
|
|
Michael Phone #: ###-####
|
BLD16-03836
| BLD-Final | 3/10/2017 | 3/10/2017 | 3/10/2017 2:57:37 PM | P | CANC |
|
|
|
BLD16-03836
| BLD-Final | 3/7/2017 | 3/10/2017 | 3/10/2017 2:57:13 PM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Naida Khan
|
BLD16-03836
| DOC - Permit Finaled | 3/10/2017 | 3/10/2017 | 3/10/2017 2:56:24 PM | P | PASS |
|
|
|
BLD16-03361
| BLD-Foundation | 3/9/2017 | 3/10/2017 | 3/10/2017 2:36:38 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD17-00186
| BLD-Wall Bracing | 3/9/2017 | 3/10/2017 | 3/10/2017 1:53:50 PM | P | PASS |
|
|
Zane Phone #: ###-####
|
BLD16-04334
| BLD-Final | 3/10/2017 | 3/10/2017 | 3/10/2017 1:53:28 PM | P | PASS |
|
|
Phone #: 2085156235 >> Inspection requested via mobile web by Brian Rodriguez
|
BLD16-04334
| DOC - Permit Finaled | 3/10/2017 | 3/10/2017 | 3/10/2017 1:53:19 PM | P | PASS |
|
|
|
BLD16-04333
| BLD-Final | 3/10/2017 | 3/10/2017 | 3/10/2017 11:36:42 AM | P | CANC |
|
|
Phone #: 2085156235 >> Inspection requested via mobile web by Brian Rodriguez Inspection cancelled via mobile web on Friday, March 10, 2017.
|
BLD17-00239
| BLD-Framing/Rough-in | 3/9/2017 | 3/10/2017 | 3/10/2017 10:07:01 AM | A | PASS |
|
|
Duane-please call for an access code Phone #: ###-####. Beam to column and to footing connections in crawl ok in existing portion of house.
|
BLD16-04000
| BLD-Footing | 3/9/2017 | 3/10/2017 | 3/10/2017 9:31:26 AM | A | PART |
|
|
Jake Phone #: ###-####. Work in progress on installing vertical reinforcement on east, north and west loading dock footing. ok to place concrete pending special inspections.
|
BLD17-00166
| BLD-Final | 3/9/2017 | 3/10/2017 | 3/10/2017 9:06:32 AM | A | PASS |
|
|
Please ahead for access and to meet at site - Shawn Phone #: ###-####
|
BLD17-00166
| DOC - Permit Finaled | 3/10/2017 | 3/10/2017 | 3/10/2017 9:06:23 AM | P | PASS |
|
|
|
BLD16-04169
| BLD-Foundation | 3/8/2017 | 3/10/2017 | 3/10/2017 8:39:10 AM | A | FAIL |
|
|
Phone #: ###-####. Interior column pad footings. Per approved plans and engineering, 8 #4 rebar required each way. Only 5 installed.
|