Inspections for the day of: Tuesday, March 10, 2020.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS19-00139 MIS-Aging Inspection3/10/20203/10/20203/10/2020 4:10:37 PM PASS
A building permit was issued and finaled.
MIS19-00139 DOC - Permit Finaled3/10/20203/10/20203/10/2020 4:10:13 PMPPASS
MIS19-00117 MIS-Aging Inspection3/10/20203/10/20203/10/2020 4:08:27 PM PASS
MIS19-00117 DOC - Permit Finaled3/10/20203/10/20203/10/2020 4:08:19 PMPPASS
BLD20-00053 BLD-Framing/Rough-in3/10/20203/10/20203/10/2020 4:06:57 PMPPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD19-04257 BLD-Final3/10/20203/10/20203/10/2020 4:06:46 PMPPASS
Sorry this one has been a tough one, i found the door blast test results, paper is on counter top, i also wrote them in on the energy sticker on the electrical panel and signed.

Thanks Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD19-04257 DOC - Permit Finaled3/10/20203/10/20203/10/2020 4:06:38 PMPPASS
BLD19-04257 BLD-Blower Door Test Results3/10/20203/10/20203/10/2020 4:06:30 PMPDONE
4.3
BLD19-02939 BLD-Energy code compliance3/10/20203/10/20203/10/2020 2:36:37 PMPPASS
Armando Phone #: ###-####
BLD20-00240 BLD-Final3/10/20203/10/20203/10/2020 2:21:17 PMPPASS
BLD20-00240 DOC - Permit Finaled3/10/20203/10/20203/10/2020 2:21:09 PMPPASS
BLD20-00244 BLD-Final3/10/20203/10/20203/10/2020 2:21:00 PMPPASS
BLD20-00244 DOC - Permit Finaled3/10/20203/10/20203/10/2020 2:20:51 PMPPASS
MIS20-00021 BLD-Final3/9/20203/10/20203/10/2020 2:20:42 PMAPASS
This inspection request is for completion of demolition for 909 S. Five Mile Rd (permit #BLD20-00240) and 871 S. Five Mile Rd. (permit # BLD20-00244). Phone #: ###-#### Inspection requested via web by James Neylan
MIS20-00021 DOC - Permit Finaled3/10/20203/10/20203/10/2020 2:20:29 PMPPASS
BLD19-03753 BLD-Final3/10/20203/10/20203/10/2020 2:00:24 PMPPEND
Eric Phone #: ###-####. Needs blower door test. Everything else ok.
BLD19-01178 BLD-Final3/10/20203/10/20203/10/2020 1:30:43 PMPNR
Wayne Phone #: ###-####. Needs life/safety and CDHD.
BLD20-00811 BLD-Framing/Rough-in3/10/20203/10/20203/10/2020 1:24:19 PMPNR
Jason Phone #: ###-####. Needs MEP rough inspections first.
BLD20-00051 BLD-Wall Bracing3/9/20203/10/20203/10/2020 11:49:16 AMAPASS
Shear // Matt Phone #: ###-####
BLD20-00054 BLD-Framing/Rough-in3/9/20203/10/20203/10/2020 11:45:24 AMAPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD19-04518 BLD-Framing/Rough-in3/9/20203/10/20203/10/2020 11:15:28 AMAPART
Interior framing w/ structural steel elements and 3 exterior window framing additions. Phone #: ###-#### Inspection requested via web by Markus Schlegel. Phase 1 interior steel stud framed walls and hardlid ok pending electrical and plumbing rough in inspections. Also structural steel columns and beams in phase 1 require special inspection. Noted bolt holes are over sized and will require plate washers.
BLD19-03756 BLD-Final3/9/20203/10/20203/10/2020 10:42:41 AMAPASS
Call for access- gari Phone #: ###-####
BLD19-03756 DOC - Permit Finaled3/10/20203/10/20203/10/2020 10:42:33 AMPPASS
Window is now tempered.
BLD19-04993 BLD-Footing3/9/20203/10/20203/9/2020 1:04:59 PMAPASS
Hello, If at all possible I would really appreciate if you could come by this afternoon as we discussed on the phone a little bit ago. It would be really nice to be able to get the garage pad and porch poured today, which is the footings that are needing the inspection, if at all possible. Thank you! Phone #: ###-#### Inspection requested via web by Melissa Davies. Interior column pad footings and thickend foorings in garage.