PLM96-00442
| INSP - Sewer and Water lines | 3/8/1996 | 3/11/1996 | 3/11/1996 12:00:00 AM | A | PASS |
|
|
03/08/96 330 - THIS WILL BE READY AFTER 11:00 MONDAY
|
PLM96-00453
| INSP - Plumbing Rough-in | 3/11/1996 | 3/11/1996 | 3/11/1996 12:00:00 AM | P | FAIL |
|
|
03/11/96 330 - 2 W/C 3 LAV 1 TUB 1 TUB/SHOWER 1 SINK 1 W/B 1 W/H AND A L run water to wh exposed in unheated garage (insulated)
|
PLM96-00457
| INSP - Plumbing Rough-in | 3/11/1996 | 3/11/1996 | 3/11/1996 12:00:00 AM | P | PASS |
|
|
03/11/96 330 - 3 W/C 5 LAV 2 TUB 1 SHOWER 1 SINK 1 W/B 1 W/H 1 LAUNDRY T WATERSOFTNER
|
PLM96-00461
| INSP - Water softener | 3/11/1996 | 3/11/1996 | 3/11/1996 12:00:00 AM | P | NH |
|
|
03/11/96 330 - ###-#### FOR ACCESS
|