PLM02-00527
| Final | 3/8/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 330 On 3/8/2002 8:14:37 AM met contractor on another job and gave him a correction notice to supply installation requirements for the installed grase trap. 3/11/2002 8:12:52 AM
|
PLM02-00225
| Final | 3/8/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/08/2002 at 13:09:14. Contact: ###-####. final as a r/i only. 3/11/2002 8:28:42 AM
|
PLM02-00343
| Groundwork | 3/8/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 330 On 3/8/2002 3:30:04 PM north branch retest ok 3/11/2002 12:11:58 PM
|
PLM02-00528
| Plumbing Rough-in | 3/11/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 09:05:29. Contact: ###-####.
|
PLM01-04250
| Final | 3/11/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | P | PASS |
|
|
###-#### jane
|
PLM01-03114
| Water and/or Sewer | 3/11/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 3/11/2002 3:16:29 PM sewer connection 120' picking up the line at the n.e. corner of the basement
|
PLM01-00343
| Groundwork | 3/11/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 3/11/2002 4:43:03 PM south branch outer ok
|