BLD99-03383
| BLD-Final | 3/8/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | A | FAIL |
|
|
mel ###-#### fn occ ; verify fireproofing approval re MTI affidavit, reports 375 &386. rec'd statement of repair from ISI (Kip Frawley, spray-on mgr.) but no approval or acknowledgement from arch.3/11/2002 4:03:12 PM 3/11/2002 4:06:22 PM
|
BLD00-01649
| BLD-Final | 3/8/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | A | PART |
|
|
mel ###-#### fn has t/o; awaiting shell final affidavit. 3/11/2002 4:08:29 PM
|
BLD01-01291
| BLD-Final | 3/8/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | A | PASS |
|
|
mel ###-#### fn plbg, elec ok; ok for l/c 3/11/2002 10:45:44 AM
|
BLD01-03156
| BLD-Conference | 3/11/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 3/11/2002 11:25:55 AM w/ bldr re stair framing...provide 1hr detail
|
BLD98-03705
| BLD-Footing | 3/11/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 3/11/2002 4:26:59 PM int. column ftgs/pile cap assy...MTI onsite,tie steel detail discrepancy noted,repair made ok.
|
MIS02-00014
| BLD-Conference | 3/7/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 340 On 3/7/2002 2:17:56 PM w/ owner,has fire corrections; this permit is superceded by MIS02-00039 3/11/2002 1:35:11 PM
|
MIS02-00039
| BLD-Final | 3/8/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | P | FAIL |
|
|
###-#### after 2 c/n issued, obtain fire final. 3/11/2002 1:37:35 PM
|
BLD00-01649
| BLD-Conference | 3/8/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 340 On 3/8/2002 3:58:24 PM ok to build out 1hr ext. walls at time of tenant improvement of retail area. 3/11/2002 4:10:01 PM
|