Inspections for the day of: Monday, March 11, 2002.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-00499 Groundwork3/8/20023/11/20023/11/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 03/08/2002 at 11:23:43. Contact: ###-####. test existing drain,s to neutralizer. provide letter for enfield fitting,s to be used under ground 3/11/2002 6:56:05 PM
PLM02-00547 Sprinkler (Final)3/8/20023/11/20023/11/2002 12:00:00 AMAPART
###-#### NICK tie in only ok still need,s to install backflow device and have tested and certified called contractor 3/11/2002 10:23:01 AM
PLM02-00561 Water and/or Sewer3/8/20023/11/20023/11/2002 12:00:00 AMAPASS
louis ###-####
PLM02-00535 Plumbing Rough-in3/11/20023/11/20023/11/2002 12:00:00 AMPPASS
###-#### PAUL
PLM02-00522 Plumbing Rough-in3/11/20023/11/20023/11/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/11/2002 at 08:36:54. Contact: ###-####. change inch-one half horizontal drain from master tub and lav to two inch as per table 7-5 in u.p.c. 3/11/2002 5:14:05 PM
PLM02-00541 Plumbing Rough-in3/11/20023/11/20023/11/2002 12:00:00 AMPPART
r/i- kevin- ###-#### cell or home-- ###-#### rough-in ok to cover need to change building water supply from one inch to inch and a quarter prior to final inspection called plumbing contractor and general building contractor 3/11/2002 6:47:45 PM