PLM02-00499
| Groundwork | 3/8/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/08/2002 at 11:23:43. Contact: ###-####. test existing drain,s to neutralizer. provide letter for enfield fitting,s to be used under ground 3/11/2002 6:56:05 PM
|
PLM02-00547
| Sprinkler (Final) | 3/8/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | A | PART |
|
|
###-#### NICK tie in only ok still need,s to install backflow device and have tested and certified called contractor 3/11/2002 10:23:01 AM
|
PLM02-00561
| Water and/or Sewer | 3/8/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | A | PASS |
|
|
louis ###-####
|
PLM02-00535
| Plumbing Rough-in | 3/11/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | P | PASS |
|
|
###-#### PAUL
|
PLM02-00522
| Plumbing Rough-in | 3/11/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 08:36:54. Contact: ###-####. change inch-one half horizontal drain from master tub and lav to two inch as per table 7-5 in u.p.c. 3/11/2002 5:14:05 PM
|
PLM02-00541
| Plumbing Rough-in | 3/11/2002 | 3/11/2002 | 3/11/2002 12:00:00 AM | P | PART |
|
|
r/i- kevin- ###-#### cell or home-- ###-#### rough-in ok to cover need to change building water supply from one inch to inch and a quarter prior to final inspection called plumbing contractor and general building contractor 3/11/2002 6:47:45 PM
|