Inspections for the day of: Monday, March 11, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-00667 Final3/6/20023/11/20023/11/2002 12:00:00 AMAPASS
MEC02-00607 Rough-in3/7/20023/11/20023/11/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/07/2002 at 17:00:08. Contact: ###-####.
MEC02-00607 Pressure Test3/7/20023/11/20023/11/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/07/2002 at 17:00:28. Contact: ###-####.
MEC02-00297 Final3/8/20023/11/20023/11/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 03/08/2002 at 14:26:15. Contact: ###-####.c/n on site 3/11/2002 11:14:19 AM
MEC02-00656 Rough-in3/8/20023/11/20023/11/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/08/2002 at 15:03:35. Contact: ###-####.
MEC02-00046 Final3/8/20023/11/20023/11/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 03/08/2002 at 16:13:24. Contact: ###-####.
BLD01-03110 BLD-Framing/Rough-in3/11/20023/11/20023/11/2002 12:00:00 AMPPART
fr john- ###-#### -call 1st before insp.. thanks ok to cover after fire sprinkler and elec r/i 3/12/2002 10:20:08 AM
BLD02-00337 BLD-Other3/11/20023/11/20023/11/2002 12:00:00 AMPFAIL
Added by Inspector: 425 On 3/11/2002 3:47:41 PM stop work issued zoning setback problem
BLD01-02863 BLD-Final3/8/20023/11/20023/11/2002 12:00:00 AMPCANC
jim ###-#### fn occ temp
BLD00-03729 BLD-Framing/Rough-in3/8/20023/11/20023/11/2002 12:00:00 AMPPASS
###-#### BRUCE steel stud framing in sanctuary 3/11/2002 2:28:31 PM