BLD01-02562
| BLD-Aging Inspection | 3/11/2003 | 3/11/2003 | 3/11/2003 12:00:00 AM | | PART |
|
|
dave with mortsen said he would have the job super call me to follow up with insp and provide aproved plan. 3/11/2003 5:04:53 PM
|
BLD01-02674
| BLD-Aging Inspection | 3/11/2003 | 3/11/2003 | 3/11/2003 12:00:00 AM | | PASS |
|
|
ubc 106.4.4 no request for insp. to verify roof assembly permit expired. permit not for occupance. 3/11/2003 8:15:51 AM
|
BLD01-02843
| BLD-Aging Inspection | 3/11/2003 | 3/11/2003 | 3/11/2003 12:00:00 AM | | PART |
|
|
ottie ###-#### said they are submiting for a extention from the building offical. 3/11/2003 8:27:10 AM
|
BLD03-00109
| BLD-Final | 3/7/2003 | 3/11/2003 | 3/11/2003 12:00:00 AM | A | PART |
|
|
###-#### ###-#### ok for temp need push pad on south exit door. need suit numbers posted. 3/11/2003 11:00:19 AM 3/11/2003 11:05:06 AM
|
MEC02-02157
| Final | 3/10/2003 | 3/11/2003 | 3/11/2003 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD99-00021
| BLD-Final | 3/10/2003 | 3/11/2003 | 3/11/2003 12:00:00 AM | A | FAIL |
|
|
###-#### ###-#### need panic hardware at pool stair east 1 st floor door/ smoke seal 2 nd floor mech rm pool area. card on site with nickol. 3/11/2003 10:50:17 AM
|
BLD02-03062
| BLD-Foundation | 3/10/2003 | 3/11/2003 | 3/11/2003 12:00:00 AM | A | PART |
|
|
###-#### ###-#### walls ok for cover pipe penatrations fier stopped/ floor sinks must be insp from bottom of floor for 2hr encapulation/ shaft and soffit supports pending insp ar later date. 3/11/2003 3:22:49 PM
|
BLD01-02634
| BLD-Final | 3/10/2003 | 3/11/2003 | 3/11/2003 12:00:00 AM | A | FAIL |
|
|
out of time. need hand railling on stair. 3/11/2003 11:34:41 AM
|
BLD01-02843
| BLD-Aging Inspection | 3/11/2003 | 3/11/2003 | 3/11/2003 12:00:00 AM | A | CANC |
|
|
follow up with scott steed ###-#### or cell ###-#### cloned to follow up at end of week. 3/11/2003 5:10:08 PM
|
BLD03-00462
| BLD-Footing | 3/11/2003 | 3/11/2003 | 3/11/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 3/11/2003 at 8:44:18 AM. Contact: ###-####.per approved plan. 3/11/2003 5:00:01 PM
|
BLD03-00067
| BLD-Energy code compliance | 3/11/2003 | 3/11/2003 | 3/11/2003 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD03-00178
| BLD-Framing/Rough-in | 3/11/2003 | 3/11/2003 | 3/11/2003 12:00:00 AM | P | PASS |
|
|
bryan; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD02-01912
| BLD-Conference | 3/11/2003 | 3/11/2003 | 3/11/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 3/11/2003 at 10:49:51 AM. Contact: ###-####. conf ok stair review of handraillings. 3/11/2003 4:44:31 PM
|