Inspections for the day of: Tuesday, March 11, 2008.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00972 INSP-Final Inspection3/11/20083/11/20083/12/2008 3:15:44 PMPFAIL
I have stopped at this tenant for two days in a row and no one has been there. No inspection performed.
FIR07-00929 INSP-Sprinkler Rough-in3/10/20083/11/20083/11/2008 4:40:25 PMPPASS
Underground supply piping can be buried. Still need an inspection on the remote FDC piping. I suggested putting in the conduit for the PIV tamper as well prior to bury.
FIR07-00579 INSP-Sprinkler Rough-in3/11/20083/11/20083/11/2008 3:30:08 PMPPART
The upright sprinkler heads are located too far from the lower deck area, at the overbuilds, where the insulation has not been installed. All piping can be covered except at the overbuild areas. One exception is the cafeteria area where Mike, the project superintendant, will provide a photograph of an overbuild area that needs addressed.
BLD07-01201 FIRE-Final Inspection3/11/20083/11/20083/11/2008 2:18:10 PMPPART
The insulation at tenant space 10370 is passed.
BLD08-00346 FIRE-Final Inspection3/11/20083/11/20083/11/2008 1:46:24 PMPPASS
Life safety passed
FIR07-00987 INSP-Conference3/11/20083/11/20083/11/2008 12:36:00 PMADONE
Scheduled by a contractor via Hello! on 3/11/2008 at 6:55:55 AM. Contact: ###-####.
BLD07-02654 FIRE-Final Inspection3/10/20083/11/20083/11/2008 12:30:16 PMAPASS
Life safety passed.