Inspections for the day of: Wednesday, March 11, 2009.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00057 Site Preparation3/11/20093/11/20093/12/2009 9:43:10 AM PASS
ESC06-01169 Aging Inspection3/11/20093/11/20093/11/2009 5:20:43 PM DONE
ESC06-01169 Site Final3/11/20093/11/20093/11/2009 5:20:32 PMPPASS
ESC08-00952 BMP Violation3/11/20093/11/20093/11/2009 3:55:18 PMPFAIL
Verbal Correction notice to Lure Excavation:
Need to clean up all petroleum fluid out onto Overland heading East towards Maple Grove. Also notified Tom Dillian with ACHD over the issue. He will be contacting Ed with Lure Construction. Will re-inspect on 3/12/09
AM.
ESC08-00968 Tracking Control3/11/20093/11/20093/11/2009 2:43:53 PMPFAIL
Verbal to RP:
Clean up all sedimentb off of all streets surounding project area. Also post the ESC sign with the project. Will re-inspect on 3/13/09
ESC08-00617 BMP Violation3/9/20093/11/20093/11/2009 2:33:26 PMAPASS
ESC09-00035 Conference3/11/20093/11/20093/11/2009 2:30:21 PMPDONE
Went over with Brown Construction of what is needed for the use of the basin to the north of the project area. Also explained to them to contact Steve Webb for what is needed for the approval.
ESC06-01153 Aging Inspection3/11/20093/11/20093/11/2009 11:22:48 AM DONE
ESC06-01153 Site Final3/11/20093/11/20093/11/2009 11:22:05 AMPPASS
ESC08-00765 Tracking Control3/9/20093/11/20093/11/2009 11:05:35 AMAFAIL
Verbal to RP:
Clean up all rock out of entrances on a daily basis.
Clean up all sediment and debris (including any tracking) within the street to the west of project and also the gutterpan going into the storm swale across the street on the west side. Will re-inspect on 03/13/09 AM.
ESC09-00088 Site Preparation3/11/20093/11/20093/11/2009 10:42:52 AM PASS
No issues present. No threat of run off on the hillside to the east of addition.
ESC08-00789 Random Inspection3/11/20093/11/20093/11/2009 10:16:50 AMADONE
Verified that violations have been correct except for 20ft of silt fence needs to be trenched in. Inspector #380 has left a message for the RP to contact him for a re-inspection of the project to have the Stop Work Order can be lifted. Per BMC 8-17 the responsible person must have day to day control over the project to asure compliance. The "Stop Work Order" will stay in place until the responsible person contacts the city for a re-inspection.
ESC08-00789 Random Inspection3/11/20093/11/20093/11/2009 10:16:21 AMADONE
Verified that violations have been correct except for 20ft of silt fence needs to be trenched in. Inspector #380 has left a message for the RP to contact him for a re-inspection of the project to have the Stop Work Order can be lifted. Per BMC 8-17 the responsible person must have day to day control over the project to asure compliance. The "Stop Work Order" will stay in place until the responsible person contacts the city for a re-inspection.
ESC08-00788 Random Inspection3/11/20093/11/20093/11/2009 10:16:02 AMADONE
Verified that violations have been correct except for 20ft of silt fence needs to be trenched in. Inspector #380 has left a message for the RP to contact him for a re-inspection of the project to have the Stop Work Order can be lifted. Per BMC 8-17 the responsible person must have day to day control over the project to asure compliance. The "Stop Work Order" will stay in place until the responsible person contacts the city for a re-inspection.