ELE10-00350
| Electrical Rough-In | 3/9/2010 | 3/11/2010 | 3/12/2010 8:58:24 AM | P | PASS |
|
|
Contact: Mark Knight Inspection requested from web by: Shelli Daylong Phone #: ###-#### walls and ceiling ok to cover, no esc this project
|
ELE10-00486
| Rough-In Permanent Service | 3/11/2010 | 3/11/2010 | 3/11/2010 4:09:40 PM | P | PASS |
|
|
Inspection requested from web by: TOM BICANDI Phone #: ###-#### corrections made, ric ok, p/s u/g rec ok
|
ELE10-00494
| Temporary Service | 3/11/2010 | 3/11/2010 | 3/11/2010 3:33:38 PM | P | PASS |
|
|
Dino Phone #: ###-#### t/s u/g n ok
|
ELE10-00487
| Electrical Rough-In | 3/11/2010 | 3/11/2010 | 3/11/2010 2:37:45 PM | P | FAIL |
|
|
Rocky Phone #: ###-#### corrections not made, fee due, check connectors, open ko in box, 1 1/4"
|
ELE08-01260
| Final | 3/11/2010 | 3/11/2010 | 3/11/2010 1:38:06 PM | P | NH |
|
|
Phone #: ###-#### called, left card, fee due
|
ELE09-02196
| Electrical Rough-In | 3/11/2010 | 3/11/2010 | 3/11/2010 12:48:43 PM | P | PART |
|
|
Robert Phone #: ###-#### corrections made, ok to cover all but laundry room
|
ELE10-00493
| Electrical Rough-In | 3/11/2010 | 3/11/2010 | 3/11/2010 11:08:48 AM | A | PASS |
|
|
Please inspect conduit from garage to house. Thanks Shaun Inspection requested from web by: Shaun Kirkman Phone #: ###-#### ok to cover u/g house to garage only
|
ELE10-00490
| Temporary Service | 3/10/2010 | 3/11/2010 | 3/11/2010 9:58:28 AM | A | PASS |
|
|
Inspection requested from web by: Alan Lusk Phone #: ###-#### t/s u/g n ok, no esc this project
|
ELE10-00074
| Final | 3/10/2010 | 3/11/2010 | 3/11/2010 9:19:46 AM | A | PART |
|
|
Ken Phone #: ###-#### unit 2211 only ok, redo 2204 for inspection next week, no esc this project
|
ELE10-00487
| Electrical Rough-In | 3/10/2010 | 3/11/2010 | 3/11/2010 8:37:32 AM | A | FAIL |
|
|
rocky Phone #: ###-#### met contractor, gave corrections for 1 1/4", use mc cable terminations, add ground screws in boxes, shall provide abrasion protection for low voltage in metal studs, no esc this project
|