Inspections for the day of: Thursday, March 11, 2010.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00010 BMP Violation3/10/20103/11/20103/11/2010 2:37:47 PMPPART
Inspect de-watering activities: Inspected the site for compliance, problems relating to de-watering is being worked by Knife River (Gary T. ###-####). Work is being performed to divert water east of Wellings Creek. At site inspection the water is retained into the Cattle Field. Ditch running through the field has direct discharge into the Boise River, but no water has reached the river. Reviewed the holding are south of the fence at the ditch and recommended to Gary T. to install checks and rock berm to allow for possible flows to be retained. Boise City will be inspecting on a daily basis until de-watering is completed. Verbal to Knife River to install a satisfactory rock construction exit at Warm Springs Ave. Inspector 460 will re-inspect on 3/12.
ESC06-01172 Aging Inspection3/11/20103/11/20103/11/2010 7:39:18 AM CANC
passed 3/9
ESC06-01171 Aging Inspection3/11/20103/11/20103/11/2010 7:38:58 AM CANC
passed 3/9
ESC10-00135 Site Preparation3/11/20103/11/20103/11/2010 7:37:54 AM CANC
site prep passed 3/9
ESC10-00137 Site Preparation3/11/20103/11/20103/11/2010 7:36:54 AM CANC
site prep passed 3/9
ESC10-00136 Site Preparation3/11/20103/11/20103/11/2010 7:36:41 AM CANC
site prep passed 3/9
ESC10-00111 Site Preparation3/11/20103/11/20103/11/2010 7:33:55 AM CANC
Site prep passed 3/9
ESC10-00117 Site Preparation3/11/20103/11/20103/11/2010 7:33:44 AM CANC
Site Prep passed 3/9
ESC10-00134 Site Preparation3/11/20103/11/20103/11/2010 7:33:29 AM CANC
Site Prep pass 3/9