FIR13-00558
| INSP-Final Inspection | 3/11/2014 | 3/11/2014 | 3/11/2014 4:28:30 PM | P | NR |
|
|
Missing ceiling tile at some locations, foil covering at six upright heads, need to provide missing escutcheons on three heads in the restroom/locker areas.
|
FIR14-00087
| INSP-Final Inspection | 3/11/2014 | 3/11/2014 | 3/11/2014 1:45:32 PM | P | PASS |
|
|
Fire sprinkler permit work passed final walkthrough.
|
BLD14-00021
| FIRE-Final Inspection | 3/10/2014 | 3/11/2014 | 3/11/2014 1:11:37 PM | A | PASS |
|
|
Fire life safety inspection completed satisfactory.
|
FIR13-00642
| INSP-Final Inspection | 3/7/2014 | 3/11/2014 | 3/11/2014 12:06:46 PM | A | PART |
|
|
Items noted include; install 18ah batteries per plan, post points map at the panel, repair damper 3rd floor, program input for sprinkler tamper at the elevator hoistway, submit plans reflecting omission of the dialer and zone card, the new FACP does not appear to meet IBC guidelines for horizontal projections at the means of egress (IBC 2012 1003.3.3). New smokes at the basement thru 3rd floors tested okay, verified signals, tested existing MP stations.
|
FIR12-00090
| INSP-Final Inspection | 3/7/2014 | 3/11/2014 | 3/11/2014 11:51:18 AM | A | PASS |
|
|
Scope of permit work completed. Fire alarm work passed field inspection.
|
BLD12-01528
| FIRE-Final Inspection | 3/10/2014 | 3/11/2014 | 3/11/2014 11:47:59 AM | A | PASS |
|
|
Verified correction items. Fire life safety passed.
|
FIR14-00075
| INSP-Alarm Testing | 3/5/2014 | 3/11/2014 | 3/7/2014 4:30:33 PM | P | CANC |
|
|
At 2:00 P.M. would be best. Phone #: ###-#### >> Inspection requested via web by Duane O'Reilly Inspection cancelled from web by: Duane O'Reilly
|