Inspections for the day of: Tuesday, March 11, 2014.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00740 General Inspection3/11/20143/11/20143/11/2014 4:48:44 PM CANC
rescheduled for 3/12
ESC13-00623 General Inspection3/11/20143/11/20143/11/2014 4:48:30 PM CANC
rescheduled for 3/12
ESC13-00738 General Inspection3/11/20143/11/20143/11/2014 4:48:15 PM CANC
rescheduled for 3/12
ESC13-01123 Site Preparation3/10/20143/11/20143/11/2014 4:25:34 PMAPASS
Follow up on verbal CN. Not a site prep. The mud clods in street were cleaned. Sidewalks were swept. Site is now back in compliance. RP Brian Murdoch called previous day to address the CN issued and stated he had it taken care of. Visual verification complete. Approved.
ESC13-00729 General Inspection3/11/20143/11/20143/11/2014 4:17:19 PM PASS
ESC14-00052 Site Preparation3/11/20143/11/20143/11/2014 4:06:30 PMPCANC
data entry error. disregard
ESC13-00834 General Inspection3/11/20143/11/20143/11/2014 3:14:29 PM PASS
ESC13-00597 Aging Inspection3/11/20143/11/20143/11/2014 3:03:58 PM PASS
WIP. BMPs installed. No corrections at this time.
ESC13-00822 DOC - Permit Finaled3/11/20143/11/20143/11/2014 9:20:41 AMPPASS
Matress Firm is complete. BLD permit already finaled. Disturbed area is now stabilized and landscaped. ESC conditions satisfied.
ESC13-00822 General Inspection3/11/20143/11/20143/11/2014 8:48:03 AM PASS