ESC13-00740
| General Inspection | 3/11/2014 | 3/11/2014 | 3/11/2014 4:48:44 PM | | CANC |
|
|
rescheduled for 3/12
|
ESC13-00623
| General Inspection | 3/11/2014 | 3/11/2014 | 3/11/2014 4:48:30 PM | | CANC |
|
|
rescheduled for 3/12
|
ESC13-00738
| General Inspection | 3/11/2014 | 3/11/2014 | 3/11/2014 4:48:15 PM | | CANC |
|
|
rescheduled for 3/12
|
ESC13-01123
| Site Preparation | 3/10/2014 | 3/11/2014 | 3/11/2014 4:25:34 PM | A | PASS |
|
|
Follow up on verbal CN. Not a site prep. The mud clods in street were cleaned. Sidewalks were swept. Site is now back in compliance. RP Brian Murdoch called previous day to address the CN issued and stated he had it taken care of. Visual verification complete. Approved.
|
ESC13-00729
| General Inspection | 3/11/2014 | 3/11/2014 | 3/11/2014 4:17:19 PM | | PASS |
|
|
|
ESC14-00052
| Site Preparation | 3/11/2014 | 3/11/2014 | 3/11/2014 4:06:30 PM | P | CANC |
|
|
data entry error. disregard
|
ESC13-00834
| General Inspection | 3/11/2014 | 3/11/2014 | 3/11/2014 3:14:29 PM | | PASS |
|
|
|
ESC13-00597
| Aging Inspection | 3/11/2014 | 3/11/2014 | 3/11/2014 3:03:58 PM | | PASS |
|
|
WIP. BMPs installed. No corrections at this time.
|
ESC13-00822
| DOC - Permit Finaled | 3/11/2014 | 3/11/2014 | 3/11/2014 9:20:41 AM | P | PASS |
|
|
Matress Firm is complete. BLD permit already finaled. Disturbed area is now stabilized and landscaped. ESC conditions satisfied.
|
ESC13-00822
| General Inspection | 3/11/2014 | 3/11/2014 | 3/11/2014 8:48:03 AM | | PASS |
|
|
|