BLD14-01447
| FIRE-Conference | 3/11/2015 | 3/11/2015 | 3/12/2015 3:11:54 PM | P | DONE |
|
|
Robert and I discussed the parapet and I deferred him to tim frost for the minimal sprinkler requirements.
|
FIR15-00039
| INSP-Sprinkler Rough-in | 3/11/2015 | 3/11/2015 | 3/12/2015 9:31:46 AM | P | CANC |
|
|
Overbooked. Rescheduled for 3/12/2015
|
FIR14-00617
| INSP-Sprinkler Rough-in | 3/11/2015 | 3/11/2015 | 3/12/2015 8:07:30 AM | P | CANC |
|
|
Overbooked. Rescheduled for 3/12/15
|
BLD15-00396
| FIRE-Final Inspection | 3/10/2015 | 3/11/2015 | 3/11/2015 3:47:09 PM | P | FAIL |
|
|
No city approved plans or review notes.Teri rescheduled for friday afternoon.
|
FIR14-00668
| INSP-Final Inspection | 3/11/2015 | 3/11/2015 | 3/11/2015 3:46:18 PM | P | PASS |
|
|
Permit finaled. Horn strobe is ok.
|
GRD14-00016
| FIRE-Final Inspection | 3/10/2015 | 3/11/2015 | 3/11/2015 3:02:36 PM | A | CANC |
|
|
Jesse agreed to reschedule for tomorrow morning due to scheduling conflict
|
BLD13-03405
| FIRE-Conference | 3/10/2015 | 3/11/2015 | 3/11/2015 2:51:04 PM | A | CANC |
|
|
fire blocking foam - Carl Phone #: ###-####
|
BLD15-00583
| FIRE-Final Inspection | 3/10/2015 | 3/11/2015 | 3/11/2015 2:46:10 PM | A | FAIL |
|
|
Provide correct single action hardware on the main exit (remove thumbturn dead bolt) and provide tag for the fire extinguisher.
|
FIR14-00881
| INSP-Final Inspection | 3/10/2015 | 3/11/2015 | 3/11/2015 2:44:58 PM | P | PASS |
|
|
permit finaled
|
FIR14-00722
| INSP-Conference | 3/10/2015 | 3/11/2015 | 3/11/2015 2:11:54 PM | A | DONE |
|
|
Brian and I went over possible problem area where there is a lack of strobe coverage. Plan modifications will be required due to NAC panel configuration changes
|
FIR14-00866
| INSP-Sprinkler Rough-in | 3/10/2015 | 3/11/2015 | 3/11/2015 12:17:40 PM | A | PASS |
|
|
Inspection on the 4th floor was just for the general rough-in, not all drops or heads are installed. No tenting has been performed. Only apartments were looked at and not the hallway. City approved plans marked.
|
FIR14-00668
| INSP-Sprinkler Rough-in/Hydro | 3/10/2015 | 3/11/2015 | 3/11/2015 12:12:30 PM | A | PASS |
|
|
Permit finaled. I verified canopies and flow switch function. Horn/strobe is ok.
|
BLD15-00598
| FIRE-Final Inspection | 3/10/2015 | 3/11/2015 | 3/11/2015 8:53:21 AM | A | PASS |
|
|
Life safety passed. Contractor needs to get the address changed from North Orchard to South Orchard.
|
BLD14-03645
| FIRE-Final Inspection | 3/10/2015 | 3/11/2015 | 3/11/2015 8:26:00 AM | A | PASS |
|
|
life safety passed
|
FIR15-00083
| INSP-Final Inspection | 3/10/2015 | 3/11/2015 | 3/10/2015 2:42:07 PM | A | CANC |
|
|
AES Radio Final for 7:30am. Phone #: ###-#### >> Inspection requested via web by Jeremy Berg Inspection cancelled from web by: Jeremy Berg
|