BLD14-01663
| BLD-Ceiling Grid Inspection | 3/11/2015 | 3/11/2015 | 3/11/2015 3:55:05 PM | P | PART |
|
|
Jeff Phone #: ###-####. Pending fire sprinkler and mech rough in inspections.
|
BLD15-00040
| BLD-Footing | 3/11/2015 | 3/11/2015 | 3/11/2015 3:23:07 PM | P | PASS |
|
|
Andy Phone #: ###-####
|
BLD15-00358
| BLD-Framing/Rough-in | 3/9/2015 | 3/11/2015 | 3/11/2015 2:51:26 PM | P | PART |
|
|
Damian-partial Phone #: ###-####. iINterior steel stud walls for changing rooms and column bump outs only.
|
BLD15-00152
| BLD-Foundation | 3/11/2015 | 3/11/2015 | 3/11/2015 1:31:13 PM | P | PASS |
|
|
|
BLD15-00260
| BLD-Foundation | 3/10/2015 | 3/11/2015 | 3/11/2015 1:30:49 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD15-00406
| BLD-Conference | 3/10/2015 | 3/11/2015 | 3/11/2015 10:43:53 AM | A | DONE |
|
|
Roof is all done thank you Phone #: ###-#### Inspection requested via web by Sandra Daffer
|
BLD15-00406
| DOC - Permit Finaled | 3/11/2015 | 3/11/2015 | 3/11/2015 10:43:12 AM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
BLD14-02972
| BLD-Ceiling Grid Inspection | 3/10/2015 | 3/11/2015 | 3/11/2015 10:19:20 AM | A | PASS |
|
|
Rocko-can you please do first thing? Was scheduled foir 3/10/15 but missed by front desk Phone #: ###-####
|