BLD15-00374
| BLD-Framing/Rough-in | 3/11/2015 | 3/11/2015 | 3/11/2015 3:24:12 PM | P | PASS |
|
|
Matt Phone #: ###-####
|
BLD14-03579
| BLD-Wall Bracing | 3/11/2015 | 3/11/2015 | 3/11/2015 2:48:05 PM | P | PASS |
|
|
2:30 grout pour on the 1st lift, MTI will be on site. thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash. 1st lift OK
|
BLD15-00598
| BLD-Final | 3/10/2015 | 3/11/2015 | 3/11/2015 1:24:02 PM | P | PASS |
|
|
Call ahead for access/30min - Shaun Phone #: ###-####
|
BLD14-03625
| BLD-Final | 3/10/2015 | 3/11/2015 | 3/11/2015 12:37:37 PM | P | FAIL |
|
|
call half hour before // John Phone #: ###-####. Missing smoke and carbon monoxide detectors and hand rail CN posted
|
GCB14-00099
| GCB-Framing | 3/10/2015 | 3/11/2015 | 3/11/2015 12:09:07 PM | A | PART |
|
|
Gary ###-#### - roofing insp. Roof Insp. Roof nailing on north 1/3 of East wing ....OK
|
BLD14-03499
| BLD-Final | 3/10/2015 | 3/11/2015 | 3/11/2015 10:52:07 AM | A | PASS |
|
|
Kathy Phone #: ###-####
|
BLD14-03499
| DOC - Permit Finaled | 3/11/2015 | 3/11/2015 | 3/11/2015 10:51:25 AM | P | PASS |
|
|
|
BLD15-00437
| BLD-Framing/Rough-in | 3/10/2015 | 3/11/2015 | 3/11/2015 10:07:38 AM | A | CANC |
|
|
Kellie Phone #: ###-####
|
BLD14-03469
| BLD-Final | 3/10/2015 | 3/11/2015 | 3/11/2015 9:35:31 AM | A | PASS |
|
|
Lisa Phone #: ###-####
|