ESC14-00671
| Aging Inspection | 3/11/2015 | 3/11/2015 | 3/12/2015 8:19:36 AM | | PASS |
|
|
|
ESC15-00094
| Site Preparation | 3/11/2015 | 3/11/2015 | 3/11/2015 4:06:59 PM | P | NR |
|
|
Boulder Heights # 6
Work on moving stockpile under ESC14-00381. Need to install BMPs for subdivision work.
|
ESC14-00614
| General Inspection | 3/11/2015 | 3/11/2015 | 3/11/2015 3:03:35 PM | | PASS |
|
|
WIP. Street and gutter are cleaning. Silt fence BMP is in good condition and erosion control blanket is staying tacked down and grass is sprouting through.
|
ESC14-00747
| General Inspection | 3/11/2015 | 3/11/2015 | 3/11/2015 2:22:07 PM | | PASS |
|
|
WIP at Simplot Plant Science compound.
Entrance off Phillipi has been closed. Landscaping is in progress. Need to finish stabilization of the area next to Greenbelt path extension and a final sweeping of surrounding hard sufaces. No trackout or non-stormwater discharges.
Will continue to monitor for stabilization/revegetation.
|
ESC13-00755
| Tracking Control | 3/11/2015 | 3/11/2015 | 3/11/2015 1:56:39 PM | P | PASS |
|
|
Returned by Terraces site to see if corrections and clean up were completed on Lysted, which was dirty due to trackout from east construction entrance.
At time of inspection, the sweeper unit had passed over the street and workers were push brooming and shoveling up the dirt that was left behind. Street looks much better and amound of sediment in gutter has been significantly reduced. Receiving inlet has DI filter bag with capacity.
No other areas of new trackout observed
|
ESC14-00921
| Aging Inspection | 3/11/2015 | 3/11/2015 | 3/11/2015 12:39:34 PM | | PASS |
|
|
No construction activity at site. No disturbed area. Project may not have started yet.
|
ESC14-00943
| General Inspection | 3/11/2015 | 3/11/2015 | 3/11/2015 12:31:37 PM | P | PASS |
|
|
Site is in good condition. Street and sidewalk have been swept. Trash and materials are contained. The pre-existing vegetation surrounding site have not been disturbed.
|
ESC14-00135
| General Inspection | 3/11/2015 | 3/11/2015 | 3/11/2015 12:25:16 PM | | PASS |
|
|
WIP. Culdesac is clean and has been swept regularly. Trash is contained in waste bin. No discharges, trackout, or hillside erosion occuring currenlty. Approved.
|
ESC13-00684
| General Inspection | 3/11/2015 | 3/11/2015 | 3/11/2015 12:00:22 PM | | PASS |
|
|
No subdivsion development work occuring at this time. Open parcels are blocked off to prevent trackout. DI's have sediment protection and the site perimeter contains runoff to treatment & retention areas.
Some SFHs currently being landscaped so road is dirty from materials and congestion. Will request that builders have sweeper on a weekend when there isnt so many worker vehicles blocking areas.
Will follow up on individual SFHs
|
ESC14-00200
| General Inspection | 3/11/2015 | 3/11/2015 | 3/11/2015 10:57:04 AM | | PASS |
|
|
Involta Data Center is complete and operational. The site grounds and stormwater retention pond were hydroseeded this week. Coverage looks good.
Will keep permit open to check that grass will grow. No violations at site.
Note: Trench work along Victory View in ROW by seperate contractor was not cleaned up. Calling ACHD inspector to see if I can get a contact to clean it up.
|
ESC14-01033
| Complaint Inspection | 3/11/2015 | 3/11/2015 | 3/11/2015 10:37:51 AM | A | PEND |
|
|
Report received of stockpiling and general mess making in the sidewalk & gutter.
Site is currently being landscapers. Workers had piled dirt on sidewalk to build berm. Upon arrival berm was mostly complete and 3 workers were sweeping up the sidewalk and gutter.
No trackout or discharges occuring, drop inlet on Five Miles has sediment protection. Will check back to make sure site has been well as the landscaping is completed.
|
ESC15-00101
| Site Preparation | 3/10/2015 | 3/11/2015 | 3/11/2015 10:18:42 AM | A | PASS |
|
|
Dan Phone #: ###-####
Dunham Commons site is ready for excavation. Permit posted, drop inlets protected, lined cement washout within development.
Requested that trash bins be provided before vertical works begins.
|
ESC15-00087
| BMP Violation | 3/11/2015 | 3/11/2015 | 3/11/2015 10:13:49 AM | A | PASS |
|
|
Follow up inspection at Dunham Commons. All subdivision storm drain inlets now have inlet protection as requested.
Trash has been picked up and loose sediment on sidewalk & gutter swept back on lot.
Site is now in compliance.
|
ESC14-00678
| Aging Inspection | 3/11/2015 | 3/11/2015 | 3/11/2015 10:10:52 AM | | PASS |
|
|
Sockeye warehouse foundation and walls are complete. No stockpiles or active cement work occuring, parking lot area is mostly free of loose dirt and sediment. Parking lot DIs have sediment sacks. No trackout or discharges offsite. Approved.
|
ESC14-00553
| General Inspection | 3/11/2015 | 3/11/2015 | 3/11/2015 10:04:45 AM | | PASS |
|
|
Building shell is complete and loose dirt/sediment is contained within the paved parking lot perimeter. No loose trash or materials, no trackout to Wildwood or Fairview.
Parking lot storm drains have filter bag protection.
Approved.
|
ESC14-00289
| General Inspection | 3/11/2015 | 3/11/2015 | 3/11/2015 9:09:32 AM | | PASS |
|
|
Home is occupied and construction complete. Permit is open to monitor landscaping and hillside revegetation that is not yet complete.
|
ESC14-00284
| General Inspection | 3/11/2015 | 3/11/2015 | 3/11/2015 8:53:35 AM | | PASS |
|
|
hillside revegetation in progress. home is occupied
|
ESC15-00135
| Site Preparation | 3/10/2015 | 3/11/2015 | 3/11/2015 8:05:57 AM | A | CANC |
|
|
Luke Phone #: ###-####
Site preparation inspected Tuesday 3/10 and passed
|