ELE19-01628
| Electrical Rough-In | 3/10/2020 | 3/11/2020 | 3/11/2020 2:52:25 PM | P | PASS |
|
|
1st and 2nd floor corridor ceiling inspection at Airport hotel. Phone #: ###-#### Inspection requested via web by Darryn Coburn 1st and 2nd floor corridor ok to cover *need cord removed above mini split in laundry areas as it is ran above ceiling
|
ELE20-00462
| Electrical Rough-In | 3/10/2020 | 3/11/2020 | 3/11/2020 2:50:59 PM | P | PASS |
|
|
Cover Ceiling Phone #: ###-#### Inspection requested via web by robert feller
Suspended ceiling ok to ocver in music room and back room
|
ELE19-03145
| Permanent Service | 3/11/2020 | 3/11/2020 | 3/11/2020 2:38:33 PM | P | PASS |
|
|
AFC calc given is L-L-L 3909 Main is rated at 65K 2 MAins for house panels are 10K
|
ELE19-03775
| Electrical Rough-In | 3/6/2020 | 3/11/2020 | 3/11/2020 12:08:00 PM | A | PASS |
|
|
Greg Critchfield is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Looked at all panelboards and location of panels in tight areas with no other place to put them..... All UPS location and transformers ok. Will re-inspect once energized
|
ELE19-04279
| Electrical Rough-In | 3/10/2020 | 3/11/2020 | 3/11/2020 11:55:20 AM | A | PASS |
|
|
Contact is Josh Smith. Please call beforehand so he can make sure to meet you onsite. Phone #: ###-#### Inspection requested via web by Candy Magly Rough-in ok to cover
|
ELE19-04546
| Final | 3/11/2020 | 3/11/2020 | 3/11/2020 9:37:51 AM | A | PASS |
|
|
door code 2294 enter Phone #: ###-#### Inspection requested via web by Bonnie Page Final ok
|
ELE20-00807
| Final | 3/11/2020 | 3/11/2020 | 3/11/2020 9:17:53 AM | P | PASS |
|
|
Temporary service final ok until demo of property ok
|
ELE20-00836
| Final | 3/10/2020 | 3/11/2020 | 3/11/2020 9:16:35 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by William Salts Temporary final for servcie unitl demo ok
|