Inspections for the day of: Wednesday, March 11, 2020.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR19-00353 INSP-Final Inspection3/11/20203/11/20203/11/2020 3:16:30 PMPCANC
Not ready for final until the interconnection with the fire alarm has been tested. Phone #: ###-#### Inspection requested via web by jeremiah robison
FIR19-00353 INSP-Sprinkler Rough-in3/11/20203/11/20203/11/2020 3:14:38 PMPPASS
The remaining sprinkler piping on the first floor is ok for cover. Forward flush test passed.
FIR19-00353 INSP-Sprinkler Rough-in/Hydro3/11/20203/11/20203/11/2020 3:13:56 PMPPASS
The overhead hydro's passed. Phone #: ###-#### Inspection requested via web by jeremiah robison
FIR19-00853 INSP-Alarm Testing3/10/20203/11/20203/11/2020 12:00:48 PMPNR
Plan mods are needed showing the correct fire alarm panel model installed and the correct means of communication installed. These items currently do not match the approved plans. No testing performed.

Phone #: ###-#### Inspection requested via web by John Lopez
BLD20-00130 FIRE-Final Inspection3/10/20203/11/20203/11/2020 10:14:32 AMAPASS
Life safety passed.

Matt Phone #: ###-####
FIR20-00052 INSP-Final Inspection3/10/20203/11/20203/11/2020 10:14:10 AMAPASS
Permit finaled.

Phone #: ###-#### Inspection requested via web by Jonathan LaFond