BLD20-00115
| BLD-Wall Bracing | 3/11/2020 | 3/11/2020 | 3/11/2020 3:41:01 PM | P | PASS |
|
|
Louis Phone #: ###-####
|
BLD20-00259
| BLD-Wall Bracing | 3/11/2020 | 3/11/2020 | 3/11/2020 3:40:46 PM | P | PASS |
|
|
Louis Phone #: ###-####
|
BLD19-03753
| BLD-Final | 3/11/2020 | 3/11/2020 | 3/11/2020 2:56:16 PM | P | PASS |
|
|
Eric Phone #: ###-####
|
BLD19-03753
| DOC - Permit Finaled | 3/11/2020 | 3/11/2020 | 3/11/2020 2:56:08 PM | P | PASS |
|
|
|
BLD19-03753
| BLD-Blower Door Test Results | 3/11/2020 | 3/11/2020 | 3/11/2020 2:56:02 PM | P | DONE |
|
|
4.0
|
BLD20-00649
| BLD-Framing/Rough-in | 3/11/2020 | 3/11/2020 | 3/11/2020 2:14:31 PM | P | PASS |
|
|
Matt Phone #: ###-####. Interior steel stud framed walls only ok.
|
BLD19-03669
| BLD-Framing/Rough-in | 3/9/2020 | 3/11/2020 | 3/11/2020 1:26:38 PM | P | FAIL |
|
|
Justin Phone #: ###-####. Foam top plate penetrations above electrical service. Nail off TJI web stiffeners per the plan. Pressure block 2x4 top chord handstack at front of garage. Correction notice posted. Ok to insulate.
|
BLD18-01027
| BLD-Conference | 3/6/2020 | 3/11/2020 | 3/11/2020 10:55:51 AM | A | NR |
|
|
Walk through to visualy inspect MOB level 2 areas for patch backs on fireproofing and fire rated penetrations. Will reinspect tomorrow.
|
BLD19-03506
| BLD-Final | 3/10/2020 | 3/11/2020 | 3/11/2020 10:26:33 AM | A | CANC |
|
|
Please call 15 minutes prior so I can be there. Wall seal complete. Framing corrections complete Phone #: ###-#### Inspection requested via web by Erik Hagen
|
BLD19-03506
| BLD-Framing/Rough-in | 3/11/2020 | 3/11/2020 | 3/11/2020 10:26:25 AM | A | PART |
|
|
Please call 15 minutes prior so I can be there. Wall seal complete. Framing corrections complete Phone #: ###-#### Inspection requested via web by Erik Hagen. All previous correction items have been repaired. Ok to foam spray exterior walls and under roof deck. Noted several areas that need fireblocked. Contractor noted that he will have these areas addresed for energy code inspection.
|
BLD19-03552
| BLD-Final | 3/10/2020 | 3/11/2020 | 3/11/2020 9:54:05 AM | A | NR |
|
|
Gabe Phone #: ###-####. Needs zoning final .
|
BLD19-02464
| BLD-Other | 3/10/2020 | 3/11/2020 | 3/11/2020 9:35:04 AM | A | PASS |
|
|
2 hour wall for elevator shaft inspection - Ed Phone #: ###-####. Per the architect, the 2hr. assembly on plans is in correct and has provided the correct assembly.
|
BLD19-02464
| BLD-Wall Bracing | 3/10/2020 | 3/11/2020 | 3/11/2020 9:33:43 AM | A | PASS |
|
|
Ed Phone #: ###-####. All nailing on interior and exterior walls ok. All floor to floor straps ok except at pool area and at east interior stairs.
|
BLD20-00054
| BLD-Energy code compliance | 3/11/2020 | 3/11/2020 | 3/11/2020 7:17:52 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Joel Hirtle Inspection cancelled from web by: Joel Hirtle
|