BLD96-00144
| INSP - Framing/Rough-in | 3/11/1996 | 3/12/1996 | 3/12/1996 12:00:00 AM | A | PASS |
|
|
|
BLD96-00164
| INSP - Foundation | 3/11/1996 | 3/12/1996 | 3/12/1996 12:00:00 AM | A | PASS |
|
|
Stem wall re-bar OK ...West side of Bldg. (1st bldg.)
|
BLD96-00472
| INSP - Footings | 3/11/1996 | 3/12/1996 | 3/12/1996 12:00:00 AM | A | PART |
|
|
EARLY START....Poured W/O inspection. Soils generally good in this area. Did not check setbacks.
|
BLD96-00495
| INSP - Footings | 3/11/1996 | 3/12/1996 | 3/12/1996 12:00:00 AM | A | PART |
|
|
EARLY START ...Poured W/O inspection. Soils generally good in this area.
|
BLD96-00501
| INSP - Footings | 3/12/1996 | 3/12/1996 | 3/12/1996 12:00:00 AM | P | PART |
|
|
EARLY START.....Poured W/O inspection. Soil generally good in this area.
|
MEC96-00745
| INSP - Gas log/ Fireplace | 3/12/1996 | 3/12/1996 | 3/12/1996 12:00:00 AM | P | PASS |
|
|
|
BLD1053909
| INSP - Framing/Rough-in | 3/12/1996 | 3/12/1996 | 3/12/1996 12:00:00 AM | P | PASS |
|
|
Framing OK Minor correction notice ...Draft stops and install metacaulk fittings better.
|
BLD96-00122
| INSP - Energy code compliance | 3/12/1996 | 3/12/1996 | 3/12/1996 12:00:00 AM | P | FAIL |
|
|
Not ready (no blue sticker)
|
BLD96-00137
| INSP - Letter of compliance | 3/12/1996 | 3/12/1996 | 3/12/1996 12:00:00 AM | P | PASS |
|
|
C/C # 10722
|
BLD96-00137
| INSP - Letter of compliance | 3/12/1996 | 3/12/1996 | 3/12/1996 12:00:00 AM | P | PASS |
|
|
C/C # 10722
|
BLD96-00137
| INSP - Final | 3/12/1996 | 3/12/1996 | 3/12/1996 12:00:00 AM | P | PASS |
|
|
Checked smoke detectors....OK C/C # 10722
|