BLD95-01675
| INSP - Framing/Rough-in | 3/11/1996 | 3/12/1996 | 3/12/1996 12:00:00 AM | A | PART |
|
|
upstairs only...cking on 1 hr ceiling and Oxygen storage rm 1 hr
|
BLD95-02175
| INSP - Foundation | 3/12/1996 | 3/12/1996 | 3/12/1996 12:00:00 AM | P | PART |
|
|
fnd. wall need spec insp on site and scope of work letter
|
MEC96-00059
| INSP - Conference | 3/12/1996 | 3/12/1996 | 3/12/1996 12:00:00 AM | P | NR |
|
|
WOOD STOVE INSTALLATION - 0 CLEARANCE. called Alan for assistance
|
BLD1053909
| INSP - Framing/Rough-in | 3/12/1996 | 3/12/1996 | 3/12/1996 12:00:00 AM | P | NR |
|
|
still firecaulking
|