ELE01-00583
| Electrical Rough-In | 3/9/2001 | 3/12/2001 | 3/12/2001 12:00:00 AM | A | PASS |
|
|
###-####. perm/svc, ok
p/s ug n spencer ele #0583
alamosa sub 3/12/2001 9:12:34 AM
|
ELE01-00521
| Final | 3/9/2001 | 3/12/2001 | 3/12/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/09/2001 at 17:01:20. Contact: ###-####. completed. ok. 3/12/2001 10:41:28 AM
|
ELE00-03113
| Final | 3/12/2001 | 3/12/2001 | 3/12/2001 12:00:00 AM | P | FAIL |
|
|
###-####. no access, called contractor. wo;; reschedule when accessible. 3/12/2001 1:54:37 PM
|
ELE01-00760
| Electrical Rough-In | 3/12/2001 | 3/12/2001 | 3/12/2001 12:00:00 AM | P | PASS |
|
|
CALL 1ST BEFORE INSP DON ###-#### R/I. ele r/i; interior walls. ok. 3/12/2001 2:27:34 PM
|